Laserfiche WebLink
1981-038 TR-48 <br />2°d Adequacy Review <br />09-Jun-2008 <br />consistent with prudent crop management in the region. Area NRCS and/or CSU county <br />agricultural extension service recommendations will need to be or obtained and documented, with <br />respect to prudent management practices. An appropriate reference area site or other success <br />standard approach will need to be identified, demonstrated to be appropriate, and incorporated <br />into the permit, along with details regarding comparisons to be made to demonstrate success. <br />Please provide a commitment within the TR-48 response materials, to provide a comprehensively <br />revised reclamation plan for the cropland land use areas at the Paonia Loadout, which will <br />address soil replacement or amendment plans, detailed planting and liability period management <br />plans, revegetation success standard, and methods of comparison for demonstration of success. <br />The commitment will need to speck submittal of a complete technical revision application by <br />September 30, 2008. <br />The commitment set forth in Item 11 of the 30-Apr-2008 cover letter (to submit a reclamation plan <br />for cropland areas at the loadout by 12/30/08) is acceptable to the Division. <br />Please incorporate this commitment into a logical section of the amended reclamation plan <br />narrative. Alternatively, the Division will attach a stipulation to the TR-58 proposed <br />decision, which will incorporate the commitment as stated. Please advise regarding how you <br />wish to proceed on this item. <br />If you have any questions, please do not hesitate to contact me. <br />Sincerely, <br />Q.LGcQ? <br />l ? . <br />Marcia L. Talvitie, P.E. <br />Environmental Protection Specialist <br />cc: Basil Bear (Bowie Resources LLC) <br />Sandy Brown, DRMS - Denver <br />5