Laserfiche WebLink
<br />YOAST MINE <br />PERMIT NO. C-1994-082 <br />Decision Date January 16, 2008 <br />REVISED APPLICATION PAGES MAPS & EXHIBITS <br />TECHNICAL REVISION (TR-36) <br />Vol. 6, T? I ; Operations <br />• Exhibit 12-1, Operations Plan - replace existing exhibit <br />Vol. 6. TAB L, Facilities <br />• Text - replace Table of Contents pages TOC-ii and -iii and text pages 3 - 8,11-1la and 21- 22 <br />• Attachment 13-10, 650 Dragline Deadhead Route - replace Table of Contents and text pages 5 - 8 <br />• Attachment 13-10, 650 Dragline Deadhead Route - insert new Figure 13-10.5, Dragline Deadhead Route <br />Channel Reconstruction Design, behind existing Figure 4, Turnout Regrading Cross Sections <br />• Attachment 13-10, 650 Dragline Deadhead Route - replace existing Addendum 13-1013, Reclaimed <br />Drainage Channel, SEDCAD+ (Input and Output) with Addendum 13-1013, Dragline Deadhead Route <br />Postmine Channel Design <br />Vol. 6A. TAB 13, Facilities <br />• Attachment 13-12, Drainage and Sediment Control Plan - replace Table of Contents page TOC-iii and <br />text pages 1- 6 <br />• Attachment 13-12, Drainage and Sediment Control Plan - replace existing Figure 13-12.3, Yoast Mine <br />Postmining Channel Designs (Sheet 1, 2 and 3 on pages 13-12.12 -13-12.13A) <br />• Attachment 13-12, Drainage and Sediment Control Plan, Appendix 13-12.1, Sediment Pond SEDCAD4 <br />Results - replace appendix Table of Contents (page 13-12.1-0 <br />• Attachment 13-12, Drainage and Sediment Control Plan, Appendix 13-12.1, Sediment Pond SEDCAD4 <br />Results - insert Pond 012A Design SEDCAD demonstration (pages 13-12.1-45 to 13-12.1-97) behind <br />existing Pond 012 SEDCAD demonstration <br />• Attachment 13-12, Drainage and Sediment Control Plan, Appendix 13-12.3, Postmining Channel Design <br />SEDCAD4 Results - replace appendix Table of Contents (page 13-12.3-1) <br />• Attachment 13-12, Drainage and Sediment Control Plan, Appendix 13-12.3, Postmining Channel Design <br />SEDCAD4 Results - replace Figure 13-12.3-1 (all three sheets; pages 13-12.3-2 -13-12.3-3A) <br />• Attachment 13-12, Drainage and Sediment Control Plan, Appendix 13-12.3, Postmining Channel <br />SEDCAD4 Results - replace Postmine Channel YPM-6 System demonstration, pages 13-12.3-5 through <br />13-12.3-60AR <br />• Attachment 13-12, Drainage and Sediment Control Plan, Appendix 13-12.3, Postmining Channel <br />SEDCAD4 Results - replace Postmine Channel YPM-8 channel design pages 13-12.3-180D and 13-12.3- <br />181 <br />• Attachment 13-12, Drainage and Sediment Control Plan, Appendix 13-12.3, Postmining Channel <br />SEDCAD4 Results - insert Dragline Deadhead Route Channel SEDCAD demonstration, pages 13-12.3- <br />208 through 13-12.3-217 <br />• Exhibit 13-12.7, Pond 012A Design - insert new exhibit <br />Vol. 6B. TAB 13, Facilities <br />• Attachment 13-21, Slope Stability Evaluation, Pond012A Design <br />Vol. 9. TAB 19, Reclamation Schedule <br />• Exhibit 194A, Backfill and Grading Plan -replace existing exhibit <br />Vol. 9, TAB 20, Bacldll and Graff <br />• Text - replace text pages 8 -10 <br />• Exhibit 20-2, Postmining Topography Map - replace existing exhibit <br />• Exhibit 20-213, Postmining Channel Profiles - replace existing exhibit