<br />YOAST MINE
<br />PERMIT NO. C-1994-082
<br />Decision Date January 16, 2008
<br />REVISED APPLICATION PAGES MAPS & EXHIBITS
<br />TECHNICAL REVISION (TR-36)
<br />Vol. 6, T? I ; Operations
<br />• Exhibit 12-1, Operations Plan - replace existing exhibit
<br />Vol. 6. TAB L, Facilities
<br />• Text - replace Table of Contents pages TOC-ii and -iii and text pages 3 - 8,11-1la and 21- 22
<br />• Attachment 13-10, 650 Dragline Deadhead Route - replace Table of Contents and text pages 5 - 8
<br />• Attachment 13-10, 650 Dragline Deadhead Route - insert new Figure 13-10.5, Dragline Deadhead Route
<br />Channel Reconstruction Design, behind existing Figure 4, Turnout Regrading Cross Sections
<br />• Attachment 13-10, 650 Dragline Deadhead Route - replace existing Addendum 13-1013, Reclaimed
<br />Drainage Channel, SEDCAD+ (Input and Output) with Addendum 13-1013, Dragline Deadhead Route
<br />Postmine Channel Design
<br />Vol. 6A. TAB 13, Facilities
<br />• Attachment 13-12, Drainage and Sediment Control Plan - replace Table of Contents page TOC-iii and
<br />text pages 1- 6
<br />• Attachment 13-12, Drainage and Sediment Control Plan - replace existing Figure 13-12.3, Yoast Mine
<br />Postmining Channel Designs (Sheet 1, 2 and 3 on pages 13-12.12 -13-12.13A)
<br />• Attachment 13-12, Drainage and Sediment Control Plan, Appendix 13-12.1, Sediment Pond SEDCAD4
<br />Results - replace appendix Table of Contents (page 13-12.1-0
<br />• Attachment 13-12, Drainage and Sediment Control Plan, Appendix 13-12.1, Sediment Pond SEDCAD4
<br />Results - insert Pond 012A Design SEDCAD demonstration (pages 13-12.1-45 to 13-12.1-97) behind
<br />existing Pond 012 SEDCAD demonstration
<br />• Attachment 13-12, Drainage and Sediment Control Plan, Appendix 13-12.3, Postmining Channel Design
<br />SEDCAD4 Results - replace appendix Table of Contents (page 13-12.3-1)
<br />• Attachment 13-12, Drainage and Sediment Control Plan, Appendix 13-12.3, Postmining Channel Design
<br />SEDCAD4 Results - replace Figure 13-12.3-1 (all three sheets; pages 13-12.3-2 -13-12.3-3A)
<br />• Attachment 13-12, Drainage and Sediment Control Plan, Appendix 13-12.3, Postmining Channel
<br />SEDCAD4 Results - replace Postmine Channel YPM-6 System demonstration, pages 13-12.3-5 through
<br />13-12.3-60AR
<br />• Attachment 13-12, Drainage and Sediment Control Plan, Appendix 13-12.3, Postmining Channel
<br />SEDCAD4 Results - replace Postmine Channel YPM-8 channel design pages 13-12.3-180D and 13-12.3-
<br />181
<br />• Attachment 13-12, Drainage and Sediment Control Plan, Appendix 13-12.3, Postmining Channel
<br />SEDCAD4 Results - insert Dragline Deadhead Route Channel SEDCAD demonstration, pages 13-12.3-
<br />208 through 13-12.3-217
<br />• Exhibit 13-12.7, Pond 012A Design - insert new exhibit
<br />Vol. 6B. TAB 13, Facilities
<br />• Attachment 13-21, Slope Stability Evaluation, Pond012A Design
<br />Vol. 9. TAB 19, Reclamation Schedule
<br />• Exhibit 194A, Backfill and Grading Plan -replace existing exhibit
<br />Vol. 9, TAB 20, Bacldll and Graff
<br />• Text - replace text pages 8 -10
<br />• Exhibit 20-2, Postmining Topography Map - replace existing exhibit
<br />• Exhibit 20-213, Postmining Channel Profiles - replace existing exhibit
|