Laserfiche WebLink
• Attachment 13-17.2, Pond 014 As-Built Report, Part II Pond As-Built Report (October 2001) - insert new slip <br />sheet at the beginning of the as-built report (certification of 10/01) <br />• Attachment 13-20, As-Built Report Sediment Structure Pond 013 - replace existing attachment slip sheet and insert <br />new introduction <br />• Attachment 13-20.1, Pond 013 As-Built Report, Part I Postmine Storage Capacity Addendum - insert new <br />attachment behind the Attachment 13-20 introduction <br />• Attachment 13-20.2, Pond 013 As-Built Report, Part II Pond As-Built Report (September 2004) - insert new slip <br />sheet at the beginning of the as-built report (certification date of 10/1/04) <br />Tab 19. Reclamation Schedule, Vol. IX <br />• Text - replace pages 3 and 4 <br />Tab 20. Backfilling and Grading, Vol. IX <br />• Text - replace TOC and pages 8-12 <br />• Attachment 20-1, Permanent Structures and Features - insert new attachment <br />• Exhibit 20-2, Postmining Topography Map - replace existing exhibit <br />• Exhibit 20-2B, Postmining Channel Profiles (2 sheets) -replace existing exhibit (2 sheets) <br />• Exhibit 20-3, Post-Mining road Profiles (2 sheets) - insert new exhibits <br />Tab U Minesoil Reconstruction, Vol. IX <br />0 Text - replace pages 23 and 24