My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMIT FILE - 2/13/2009, 1:36:34 PM-JWD
DRMS
>
Public
>
PERMIT FILE - 2/13/2009, 1:36:34 PM-JWD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:28:25 PM
Creation date
2/13/2009 1:37:25 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2009002
IBM Index Class Name
PERMIT FILE
Doc Date
2/12/2009
Doc Name
New Prospecting NOI
From
Golden Age Number Two Mining Co
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 (Form. 1 - A11 information for .D:RMS use and eonfidentiat filing) <br />'. List the seed mixture to be used in the re-establishment of vegetation. See the attached seed mixture calculation to obtain <br />PLSlacre. For assistance with formulating seed mixtures and rates, contact the local NRCS if on private land, BI.M; USFS if <br />on public land or State band Board if on state land. <br />A. Provide plant name and seeding rate <br />:Plant Name ~^~ <br />1 <br />Colorado Forest Service <br />- ~-- Seeding Rate (PLS/acre} j <br /> <br /> <br />_. <br />Black Ti er Reveget. ~~ <br />~~4.4~_Pip el~ne PLan -__~ _ <br /> ____ <br /> <br />- <br />~ ---- <br />- <br /> I <br />- <br />_ <br />I <br />B. Describe the method for seed bed preparation, and application method for grass/forb seeding: <br />Any cut or trench will have the vegetation cut below the roots, laid next <br />to the cut, refilled with topsoil from the area on the cut and the vegetation <br />p ace ac on top o t e cu - <br />Should reseeding be necessary, it will be done after the replacement of <br />V. TI'sRl~`[S AND CONDI'CIONS FOR PROSPFCTINC OPI+/RATI.ONS: <br />1t.eclat~ttation. tneasures sltall be fill .filled in a timely ma.n.ner and completed z~ittt.in eve (S) y~:ars of completion ot`prospecting <br />activities. <br />Z. 'l`he prospecting {>perations clescriFsecl in this l~voti~e will be conducted in. such a manner as to nsinintire surface disturbancos. <br />In a{ldition to the measures required in kale 5, precautions to be. tak~:n include: <br />~'~. Confinement of operations to areas near existing roads or trails, where practicable. Existing roads which are to remain as <br />permanent roads after prospecting activities are completed shall be Ieft in a condition equal to or better than the pre- <br />prospecting condition; <br />B. Dril3i.ng snail be c{srtdiscted isl such. a ~s=ay ~s to prevent cutti.t~.gs an.<l fluiels frc~sn directly etiteri?sg any c?ry or f)csw•iixg <br />str~;am eharirlei. Drill c.alrtings must be spread. t{3 a depth no greater th::ti ono-half ("1/~} it7cll ar bl_iried in arl approved <br />cltsp{ssal pit; <br />
The URL can be used to link to this page
Your browser does not support the video tag.