Laserfiche WebLink
M1994-117, TR-05, T.Waldron January 27, 2009 3 of 3 <br />6) MRV would like to highlight the limited nature of impact, potential or otherwise, <br />under the current 110(2) permits and the excellent environmental track records of <br />both Calais and MRV. <br />7) Pursuant to both the M1994-117 and M1983-141 permits, MRV conducts <br />quarterly environmental monitoring in numerous locations throughout the site. <br />MRV asserts that the addition of Cross Mine material to the processing on site <br />will be monitored in an equally effective manner as the material already <br />processed. <br />MRV is committed to adherence with all applicable regulations and looks forward <br />the DRMS response to this request for a Technical Revision (TR-07). <br />We greatly appreciate the help that you and your staff have given us. <br />Sincerely, <br />MOUNT ROYALS VENTURES, LLC <br />By Matt Collins <br />Project Manager <br />Enc: Table 7.1 - Ore Comparison <br />Table 7.2 - SPLP & TCLP Comparison <br />"Resource Development, Inc., XFR Results for, "Cross Mine" Samples", The <br />Mineral Lab, Inc., January 7, 2009. <br />"Cross Mine Tailings and Waste Rock Characterization by SPLP and TCLP", <br />ACZ Laboratories, Inc., Project L68902, June 19, 2008. <br />"30 Element ICP Analysis - MRV Tailings", Loring Laboratories, Ltd., <br />November 9, 2007. <br />"Whole Rock Analysis - MRV Tailings", Loring Laboratories, Ltd., November 9, <br />2007 <br />"TCLP, Metals - Bulk Flot. Tails", Evergreen Analytical, Inc., April 15, 1998 <br />M1994-117 TR07 1-30-09.docx