Laserfiche WebLink
TWENTYMILE COAL COMPANY - FOIDEL CREEK MINE <br />MINOR REVISION MR09-235 -18 LEFT SHAFT GEOTECH. INVESTIGATIONS <br />SUMMARY OF REVISIONS/ADDITIONS (02/09) <br />REVISION/ADDITION DESCRIPTION PLACEMENT INSTRUCTIONS <br />TABLE OF CONTENTS <br />Page xii Revised List of Exhibits to Replaces Page xii in Volumes I, <br /> include Exhibit 49R and II throu h II-E <br />OPERATIONS PLAN - MINE FAC ILITIES RULE 2.05 <br />Pages 2.05-45.6f, , 45.7, and Revised operations and Replace Pages 2.05-45.6f, , 45.7, <br />106 reclamation plan text 106, and 106-1 in Volume I <br /> describing 18L Vent Shaft <br /> drilling pad geotechnical <br /> investigations <br />EXHIBITS <br />Exhibit 49R, 18LT Mine New Exhibit Insert after Exhibit 49Q in <br />Ventilation Shaft Installation - Volume II-D <br />Design Drawings