C-1981-022 <br />RN-05 Findings <br />February 2009 <br />The permit was transferred from Oxbow Carbon & Minerals, Inc. to Oxbow Mining, Inc. on January <br />23, 1998 with Succession of Operator No. 4 (SO-04). <br />Oxbow Mining, Inc. submitted an application for permit renewal (RN-03) on March 13, 1998. The <br />submittal was called complete by the Division on March 23, 1998, thereby securing the right of <br />successive renewal for the Sanborn Creek Mine. The Division's adequacy review letter was dated <br />July 30, 1999. Because the operator chose to rewrite and reorganize the entire Sanborn Creek Mine <br />permit application, it was decided to separate the permit application reorganization effort from the <br />permit renewal process. Since the permit renewal adequacy questions were more pertinent to the <br />reorganization, rather than to the permit renewal itself, the OMI responses to the permit renewal <br />adequacy review questions were submitted in a new Permit Revision No. 4. RN-03 was approved on <br />September 25, 2000. <br />Permit Revision No. 4 (PR-04) was submitted September 5, 2000, and called complete September <br />15, 2000. DMG issued the decision on January 9, 2002. Because of computer problems with the <br />Department of the Interior, the final AVS check was not accomplished until January 16, 2002. <br />During the review of PR-04, the Division conducted a complete bond inspection of the mine and <br />recalculated the reclamation bond liability at $3,117,145.00. <br />On September 19, 2001, Oxbow Mining, Inc., initiated the process of transferring the coal permit <br />from that entity to Oxbow Elk Creek, LLC, and then to Oxbow Mining, LLC (OMLLC). This <br />transfer of permit (SO-05) received approval on October 22, 2001. No comments were received, and <br />the transfer became effective November 20, 2001. <br />OMLLC submitted an application for Permit Revision No. 5 (PR-05), received by the Division on <br />February 15, 2003, to revise the Elk Creek Mine longwall plan and add a 160-acre lease modification <br />to accommodate a reorientation of the longwall panels. The area of the lease modification was <br />within the approved permit area. The application was initially found incomplete because the package <br />did not contain information on the possible effects of subsidence on groundwater and surface water <br />hydrology. Additional information was submitted and the application was called complete on <br />August 1, 2002. Upon the submission of a revised D-seam subsidence report for the amended <br />longwall orientation, PR-05 was approved on January 20, 2003. The federal mine plan approval was <br />signed June 23, 2003 for mining in the D-seam. <br />OMLLC submitted an application for permit renewal (RN-04) on February 21, 2003. The submittal <br />was called complete by the Division on March 3, 2003, thereby securing the right of successive <br />renewal for the Sanborn Creek Mine. A preliminary adequacy letter was sent to Oxbow Mining LLC <br />on March 10, 2003. Oxbow submitted materials to satisfy stipulations 25 and 34. A complete bond <br />inspection was performed and the bond liability was confirmed as $3,117,045.00. RN-04 was <br />approved on October 3, 2003. <br />On January 11, 2008, the Division notified Oxbow Mining, LLC of the impending permit renewal <br />(RN-05) and the need to file a complete application by April 14, 2008. OMLLC subsequently