My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-02-03_REVISION - M2006084
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2006084
>
2009-02-03_REVISION - M2006084
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:18:29 PM
Creation date
2/10/2009 8:34:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2006084
IBM Index Class Name
REVISION
Doc Date
2/3/2009
Doc Name
Amendment application approval
From
DRMS
To
Greg Lewicki & Associates
Type & Sequence
AM1
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency or organization name: DRMS <br />Permit or other job action :AM-01 Final Reclamation Cost Estimate <br />Task description :Rip areas prior to topsoiling <br />HOURLY EQUIPMENT COST <br />Basic machine: Cat DSR Series 11 - 8U (2005) Horsepower : 310 <br />Blade type : Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br />Data source : (CRG) <br />Cost Breakdown : Ownership cost/hour : <br />Dozer operating cost/hour : <br />Ripper operating cost/hour <br />Operator cost/hour <br />Total unit cost/hour <br />MATERIAL QUANTITIES <br />Utilization % <br />$57.69 NA <br />$77.43 100 <br />$6.86 100 <br />$32.78 NA <br />$174.75 Total fleet cost/hour : $699.00 <br />Selected estimating method : Area <br />Alternate methods - <br />Seismic : NA NA Load factor : NA Bank volume : NA BCY <br />Area : 23.20 acres Rip depth (ft) : 2.00 Volume : 74,859 BCY or CCY <br /> <br />Source of estimated quantity : Table L-1 <br />Source of estimated load factor : NA <br /> <br />HOURLY PRODUCTION <br />Alternate methods - Job Condition Correction Factors - <br />Seismic : Seismic velocity : NA feet/second Unadjusted production <br />Unadjusted production : NA cu. yds./hour per selected method : 2,624.71 cu. yds./hour <br /> <br />Area : Avg. ripping depth : 2.00 feet/pass Site altitude : 5,700 feet <br />Average ripping width : 7.08 feet/pass Altitude adjustment : 1.00 (Cat HB) <br />Average ripping length : 400.00 feet/pass Job efficiency factor : 0.83 (1 shift/day) <br />Average dozer speed : 88.00 feet/minute Net job correction : 0.83 multiplier <br />Average maneuver time : 0.25 minutes/pass <br />Production per unit area : 0.813 acres/hour Adjusted unit production : 2,178.51 cu. yds./hour <br />Unadjusted production : 2,624.71 cu. yds./hour Adjusted fleet production : 8,714.03 cu. yds./hour <br /> <br />JOB TIME AND COST <br />Fleet size : 4 dozer(s) Total job time : 8.59 hours <br />Unit cost : $0.080 per cu. yd. Total job cost : $6,005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.