Laserfiche WebLink
STRUCTURE or ITEM DESCRIPTION DIMENSIONS DEMOLITION MENU SELECTION QUANTITY UNIT UNIT COST TOTAL COST <br />-NSI Plant 200'1 x 1751 x 50'H Demo./disp./excav. pit - 200' push 1,750,000.00 CF $0.2085 $364,878.63 <br />Product Storage Dome 1001 x 100' W x 50'H Demo./disp./excav. pit - 200' push 500, 000.00 CF $0.2085 $104,251.04_ <br />-Scale Building 20'W x 100'L x 15'H Demo./disp./excav pit - 200'push 30,000.00 CF $0.2085 _ $6,255.06 <br />-Removal of Conveyor System 200'L Conveyor, elevated - 5'W x 6'H 200.00 LF $37.8300 _ $7,566.00_ <br />-Removal of Overhead Powerline 2100'L Power/phone line - single pole 2,100.00 LF $2.5400 $5,334.00 <br />-Tank Farm 30'W x 50'H (5 tanks) Tank Removal and Disposal in pit 5.00 Tank $2,000.0000 $10.000.00 <br />-Removal of Pipeline 3600 feet Pipe, welded steel - 10 in. diam. 3,600.00 LF $12.4900 $44,964.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />JOB COST Subtotal (unadjusted): $543,249 1 oiai %,obt tduju-u, w. ian uuv. q.