My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-02-02_REVISION - M1983194
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1983194
>
2009-02-02_REVISION - M1983194
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:19 AM
Creation date
2/10/2009 8:34:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983194
IBM Index Class Name
REVISION
Doc Date
2/2/2009
Doc Name
Final reclamation cost estimate
From
DRMS
To
Natural Soda, Inc.
Type & Sequence
SI1
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />TASK L <br />_ , <br />IST (DIRECT COSTS) . _ ........... <br /> <br />FORM <br /> <br />FLEET <br /> <br />TASK <br /> <br />DIRE <br />ST <br />NO. <br />01a - <br />02a - <br />03a - <br />04a <br />05a TASK DESCRIPTION <br />P&A for Monitoring Wells <br />P&A for Production and Recovery Wells <br />Re-grade 6.91 acres of well pad disturbance <br />-Distribute 6" topsoil over 6.91 acres of re-graded well pads <br />-Revegetate 6.91 acres USED <br />borehole <br />borehole <br />dozer <br />dozer <br />revege SIZE <br />1 <br />1 <br />1 <br />1 <br />1 HOURS <br />15.0 <br />60.0 <br />31.9 <br />4.5 <br />16.0 CO <br />$15,751 <br />$61,901 <br />_ $10,250 <br />$1,470 <br />$8,820 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> SUBTOTALS : 127.5 61 $98,192 <br />o <br />NA ?o TOTAL DIRECT COST JS9tf,7YZ <br />"includes inflation factor adjustment of : ,.; :.:,::.... <br />INDIRECT COSTS <br />Liability insurance : <br />ROFIT <br />2.02 <br />% of direct total <br />$1,983 <br />- <br />OVERHEAD AND P <br />Performance bond : 1.05 % of direct total = $1,031 <br />Job superintendent : NA* NA NA total = NA <br />Profit : 10.00 % of direct total = $9,819 <br /> TOTAL O & P = $12, 834 <br />" not required (or eqp. operator serves as super.) <br />CONTRACT AMOUNT (direct + O & P) = <br />$111,026 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT - total $ NA total = $0 <br />Financial warranty processing (legal/related costs) : 0.00 <br />Engineering work and/or contract/bid preparation : 4.25 % of cntr. NA total = $4,719 <br />Reclamation management and/or administration : 5.00 % of cntr. NA total = $5,551 <br /> NA* NA total = NA <br />CONTINGENCY - TOTAL INDIRECT COST $23,104 <br />contingencies accounted for at task level TOTAL BOND AMOUNT (direct + indirect) _ $121,296 <br />
The URL can be used to link to this page
Your browser does not support the video tag.