Laserfiche WebLink
14"I'1 r-r' ?vJ? <br />STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Depamnent of Natural ResourcE;,ms <br />131:3 Stte.rman St., Room 215 <br />Denver, t;oiorado 8020:3 <br />Phone: (3038,66-3567 FAX: !1.303183 2-8106 <br />0 r? my 57_5-f <br />APPLICATION FORM. <br />COLORADO <br />D( V i S t 0 4 () F <br />RECLAMATION <br />MINING <br />SAFETY <br />sal Ritt?:-r, <br />cloverttor <br />Exercui;ve IDirEctor <br />Ronald VVCanary <br />r7iyisirr. D}rector <br />Natural Resource. Tntoee: <br />0&5?? 5 /DAfi /,l C - olb?& dl)ta Colvipol-) 1-f7 6 4- Aela- &t-,,? <br />The application for a Transfer of Permit and Succession of Operators must contain four (4) major parts: 1) an Application Form; 2) <br />an Application. Fee; 3) a Performance Warranty (attached as part of the Application Package) bearing the original notarized <br />signature of the Successor Operator; and, 4) a replacement Financial Warranty provided by the Successor Operator, bearing an <br />original notarized signature- To expedite processing, please provide the information in the format and order described below. <br />1. FINANCIAL WARRANTY INFORMATION (Choose ONE Option): <br />1. Option A: I wish to WAIVE MY RIGHT to a 30-day processing time to allow the <br />(Initial & Date) Division of Reclamation, Mining and Safety to recalculate the Financial <br />Warranty requirements. If you choose Option A you should not submit a <br />Financial Warranty and Performance Warranty until the Division notifies you <br />of the correct amount of your warranty requirements.* <br />2. Option B: <br />(Initial & Date) <br />RECEIVED <br />JAN 14 2009 c---' <br />Division of Reclamation, <br />,rJ: Mining and Safety L,,--" <br />TRANSFER OF PERMIT AND SUCCESSION OF OPERATORS <br />1. DO NOT WISH TO WAIVE MY RIGHT to a 30-day processing time. I <br />hereby submit a replacement Financial Warranty for the same dollar amount <br />as the Financial Warranty, maintained by the current operator. I. understand <br />that the Division of R.ecl.antati.on, Mining and Safety will recalculate the <br />required reclamation bond within 60-days from the date that: the transfer is <br />c: rnpleted and the required 4`ARR.r ? `l`Y COULD BE <br />S.L."B S; ANTI. M.,LY:I.NC .RE SED at that: th.pe.. As the new operator, l agree <br />to be responsible for posting any required increase to the financial warranty <br />for good cause shoNAn, in a form acceptable to the Board, within 60-days of <br />such notice. <br />t_}t+kce 0: {)tfloc.. of <br />minrsd 1 ..and k€>dantation Denver • (.;rand junction • Dur<sng0 A( tive and InactiW v il(}s