Laserfiche WebLink
Rockdust Distribution System <br />Mine Communications System <br />r Personnel First Aid and Safety Equipment <br />Personnel Carriers <br />Shield Roof Support Carriers <br />Supply Tractors and Trailers <br />Lubrication Trailers <br />Maintenance Equipment and Supplies <br />Front End Loaders <br />Haulage Trucks <br />Dozers <br />Motor Grader <br />Water Truck <br />Boom Truck and Fork Lifts <br />Utility Trucks and Light Vehicles <br />Air Compressor <br />Welders <br />Generators <br />Light-Plants <br />Pumps <br />EASTERN, NORTI3ERN, AND WESTERN MINING DISTRICT <br />The same mining methods utilized at the existing Foidel Creek Mine will be used to mine coal from the Eastern, <br />Northern and Western Mining Districts. The only significant differences will be longwall panel length and width, <br />i.e. approximately 10,000 - 17,000 feet in length compared with original panel length of approximately 10,000 feet, <br />} and 1,000 - 1,200 feet wide compared to the original panel width of approximately 640 feet. <br />The existing surface facilities, including the bathhouse, offices, shop/warehouse, coal stockpiling and handling <br />systems, and coal loadout will continue to be used for mining coal from the Eastern, Northern and Western Mining <br />Districts. In order to support mining in the EMD and NMD, a dewatering facility was constructed and three fans <br />installed. One new fans, the Zero-Entry Fan, has been previously permitted. The location of the new support <br />systems are shown on Map 23, Mine Plan, and Maps 17 and 17A and Maps 18 and 18A, Premine Soils and <br />Premine Vegetation, respectively, and these systems are described in greater detail in the following sections. Only <br />one of the new fan sites (the EMD or lAP and Robinson Fans)at the east end of the 9-Right longwall panel between <br />the 9- and 10-Right gateroads, required construction in an undisturbed area. At this site, two fans were installed <br />and associated ancillary structures were constructed. In order to support continuing and future mining in the NMD <br />and WMD, a second dewatering borehole was completed (TORT Borehole 2), a new intake shaft (18RT Shaft) was <br />installed, and a new intake shaft and associated support facilities (6MN Facilities) were completed. <br />EMD (Panels 2 Right through 6 Right, PR 97-04) <br />The same mining methods utilized in the EMD will be used to extract the coal from the remainder of the EMD. <br />The existing surface facilities, including the EMD ventilation sites, will be used for mining of coal in the new five- <br />year permit area. Presently, no new surface facilities are planned in support of the mining that is to occur in the <br />remainder of the EMD. <br />NMD (Panels 12 Right through 16 Right, PR 99-OS) <br />The same mining method utilized in the EMD will be used to extract coal from the NMD, except that the face width <br />~~ is increased to 1000-foot. The existing surface facilities, including the EMD ventilation site, will be used for <br />mining of coal in the NMD permit area. <br />TR08-64 2.05-11 06/17/08 <br />