My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-12-01_PERMIT FILE - C1982056A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1982056A
>
2008-12-01_PERMIT FILE - C1982056A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:38:23 PM
Creation date
2/6/2009 1:44:00 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056A
IBM Index Class Name
Permit File
Doc Date
12/1/2008
Doc Name
Pages 2.05-1 to 2.05-64
Section_Exhibit Name
2.05 Operation and Reclamation Plans
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NMD (Panels 12-Right through 16-Right, PR 99-OS) <br />-~~ TCC will continue to mine the reserves it controls in the Twentymile Park Basin. The mine moved operations into <br />the NMD as shown on Map 23, Mine Plan Map. TCC controls all of the coal required to mine in this area. TCC <br />projects annual coal production at up to10 million tons per year. <br />TCC uses the longwall mining method as the primary technique for assuring maximum recovery of the resource. In <br />the NMD, plans call fora 1,000-foot wide face, with panel lengths ranging from approximately 13,600 to 17,000 <br />feet. The gateroads, main and submains will be developed by continuous miner, as is the current practice. <br />NMD (14-Right Gateroad Alternate Location, MR 01-171) <br />TCC evaluated whether or not the 1,000-foot wide face could be increased to approximately 1,200 feet or wider. In <br />general, the outcome of the evaluation limited the face width to something less than 1,200 feet. In order to <br />accommodate the uncertainty associated with this evaluation, and initiate the start of the gate-road, an area is shown <br />in red on Map 23 and 23 B for potential areas in which the 14 Right Gateroad will be started. <br />NMD (Panels 17-Right through 21-Right, PR03-06) <br />The mine continues its operation into the NMD as shown on Map 23, Mine Plan Map. TCC has projected annual <br />coal production to increase from the current levels to a maximum of approximately 12 million tons per year. <br />TCC uses the longwall mining method as the primary technique for assuring maximum recovery of the resource. In <br />Panels 17- through 21-Right, mining continued in the NMD during this permit term with a 1,000-foot wide panel <br />and panel lengths ranging from approximately 10,900 to 15,700 feet. The gateroads, main and submains were <br />developed by continuous miner, as is the current practice. <br />NMD (Panels 21-Right through 24-Right (24-Right Partial), PR06-07) <br />The mine will continue its operations to the geologic/economic limits of the NMD as shown on Map 23, Mine Plan <br />Map. TCC projects ongoing annual coal production of up to approximately 12 million tons per year. <br />TCC uses the longwall mining method as the primary technique for assuring maximum recovery of the resource. In <br />Panels 21- through 24-Right, mining will continue in the NMD during this permit term with a 1,000-foot wide <br />panel and panel lengths ranging from approximately 9,500 to 15,700 feet. The gateroads, main and submains will <br />be developed by continuous miner, as is current practice. <br />WESTERN MINING DISTRICT (WMD) <br />WMD (Panels 13-Left through 17-Left -Initial (Phase I) and Phase II Development of Mains and Submains, <br />PR06-07, TR07-63, TR08-64) <br />TCC will continue to mine the reserves it controls in the Twentymile Park Basin. Preliminary (Phase n <br />development of the WMD was initiated under PR06-07 and TR07-63 to facilitate extension of mine ventilation and <br />support facilities for both the northern portion of the NMD, and the new WMD. into the Northern Mining District <br />as shown on Map 23, Mine Plan Map. With the exception of the pending federal coal lease for un-leased federal <br />coal in Sections 22 and 27, TSN, R87W, TCC controls all of the coal required to mine in this area. TCC projects <br />annual coal production at up to12 million tons per year. <br />TR08-64 2.05-2.1 06/17/08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.