Laserfiche WebLink
B. LLI9DING IN TU RAW MATERIAL S7UC~{TPILE: <br />• <br />Method of loading to (Truck Bottom Drmip, Fivnt-End Loader, etc.) <br />Cnal ;c loaded directly from oit_into trucks with no stockpile. <br />Loading Schedule: tons/hr., hrs./day, days/year. <br />Proposed Controls for Loading to Stockpile <br />Controls Include: Water Sptsy, Chemical Suppressants, tL11 enclosure, <br />partial enclosure, Other (specifyJ, No Control <br />C. R9W MATERIAL S70CIQ~ILE: NIA <br />(MATERIAL) <br />• <br />~`laximum Tons Stored At Any One Time <br />Length of Time Pile Remains Undisturbed <br />Proposed Control: (cherJr appropriate boxes) <br />L/ Watering times/dap, or <br />(to maintain moist surface) <br />L/ Chemical Stabilizer (Type _ <br />107711 <br />Idx7C Ct144 <br />Continuous Sprinkler <br />L/ Ehclosures: Complete, or <br />L/ Other (specify) <br />L/ No Contro! <br />Phrtial (check one) <br />D. LOADING O(II' F7X)N R9W MATERIAL S7t7f7iPILE: <br />Method of Loading out (Front-End Loader, Conveyor, etc.) <br />Front-end loader directly from pit. <br />Loading Schedule: 300 tons/hr., 5 ~,/~y~ 250 davs1year. <br />Proposed Controls _ No Controls <br />Controls Include: Water Sprap, Chemical Suppressants, <br />Other (specify), No control <br />• Loader works in pit while it waits for coal haul trucks to cycle. <br />page 5 <br />