Laserfiche WebLink
EXHIBIT "L" <br />Oaklands Ranch Gravel Pit - Existing Mining Area <br />Reclamation Idems Quanity Unit Unit Cost Total Unit Cost <br />Replace Overburden 522 LCY $1.00 $522.00 <br />Place Topsoil Over Area 5211 LCY $1.00 $5,211.00 <br />Seed Bed Preparation 9.69 Acre $27.00 $261.63 <br />Fertilizer Application 9.69 Acre $28.00 $271.32 <br />Seeding Drilling Method <br />Seed Included <br />(Hay Meadow) 8.91 Acre $150.00 $1,336.50 <br />(Natural Area) 0.78 Acres $105.00 $81.90 <br />Mulching W/ Hay & Straw 9.69 Acre $165.00 $1,598.85 <br />Weed Control Allowance 9.69 Acre $25.00 $242.25 <br />Mobilization & <br />Demobilization Each $1,120.00 $1,120.00 <br />Total Direct Cost $10,645.45 <br />Indirect Costs <br />Public Liability Insurance 1.55% $165.00 <br />Contractor Performance <br />Bond 1.55% $165.00 <br />Contractor Profit 10.00% $1,064.55 <br />Division of Minerals & <br />Geology Adim. Expense 5.00% $532.27 <br />Additional Supervision 3.00% $319.36 <br />Total Performance Bond <br />Amount (Existing <br />Mining Area) $12,891.64