Laserfiche WebLink
Table 1. Result of Second Half 2008 Monitoring, GCC Rio Grande, Inc. Red Rock Plant and Limestone Mine. Sampling conducted <br />November 6, 2008. - Continued <br />Anal a Method Units MW-002 MW-003 MW-004 Du -01 EB-01 <br />GENERAL CHEMISTRY <br />Total Alkalinity SM2320B m /L 310 443 375 318 <0.50 <br />Bicarbonate SM2320B m /L 310 443 375 318 <0.50 <br />Carbonate SM2320B m /L <5.0 <5.0 <5.0 <5.0 <0.50 <br />Chloride E300.0 m /L 39.2 69.3 39.4 39.2 NA <br />Fluoride SM4500F-C m /L 0.62 1.0 0.81 0.63 NA <br />Sulfate E300.0 mg/L_ 814 1,210 1,350 815 NA <br /> <br /> <br />Ammonia as SM4500- <br />NH3 mg/L <0.80 <0.80 <0.80 <0.80 NA <br />Nitrite as E300.0 m /L <0.12 <0.12 <0.12 <0.12 NA <br />Nitrate as N E300.0 m /L <0.09 0.224 5.0 <br /><0.09 <br />NA <br /> NA <br />Total Cations Calculated Me /L 22.45 35.65 37.17 22.5 NA <br />Total Anions Calculated Me /L 24.25 36.01 37.07 24.43 NA <br />Cation-Anion Balance Calculated % Diff 3.86 0.51 0.13 4.01 NA <br /> NA <br />Total Hardness Calculated mg/L as CaCOs 850 1,200 1,300 850 NA <br />Total dissolved solids SM 2540C m /L 1,820 2,440 2,560 1,570 NA <br />2of3