My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-12-03_PERMIT FILE - C1992081A (5)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1992081A
>
2008-12-03_PERMIT FILE - C1992081A (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:38:32 PM
Creation date
2/5/2009 2:00:42 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081A
IBM Index Class Name
Permit File
Doc Date
12/3/2008
Doc Name
Railcar Loadout Operations Plan Reclamtion Liability Estimate (Existing and On-the-Ground)
Section_Exhibit Name
Tab 23 Attachment 23-2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />C7 <br />r~ <br />Hayden Gulch Loadout ~ ~ ~ ~ <br />- <br />Facility Demolition -Existing and On-the-Ground Buildings I ~ ~ ~ <br />(Coal Loadout Operations) ~ ~ ~ <br />I <br />Original Estimate Prepared 1117/07 for MR-16 <br />Revised 6!27108, using RN-03 provided costs ~ <br />Buildings and Dimensions presented in Table 12-1.2 <br />Unit Costs are generally based on CDRMS Liability Calculation prepared 5/13/08 as part of RN-03 <br /> <br />Description Dimensions Reference Quantity Unit Cost Total Cost <br />Disconnect electrical power supply 5 Electrician° 5 HR $65.00 $325.00 <br /> <br />Section 14 Fence Removal (from Land Board lands) 3800 Dillon Fencing5 3800 LF $0.40 $1,520.00 <br />Disconnect electrical power supply to interior light poles 4 Electrician° 4 HR $65.00 $260.00 <br />Remove interior light poles 2 CDMG6 2, HR $99.75 $199.50 <br />Remove mine ID signs 8 8 HR $30.00 $240.00 <br /> <br />Building Demolition and Removal Subtotal $390,588.28 <br /> <br />12" culverts 166 CDRMS' 166 LF $2.174 $360.83 <br />18" culverts 469 CDRMS 469 LF $2.353 $1,103.70 <br />24" culvert 940 CDRMS 940 LF $3.155 $2,965.51 <br />36" culverts 50 CDRMS 50 LF $4.86 $243.17 <br />48" culverts 152 CDRMS' 152 LF $6.193 $941.26 <br />60" culverts 290 CDRMS 290 LF $13.05 $3,785.72 <br />96" culverts 165 CDRMS 165 LF $30.814 $5,084.23 <br />102" culverts 585 CDRMS' 585 LF $30.814 $18,025.90 <br />108" culverts 330 CDRMS 330 LF $42.905 $14,158.58 <br />Culvert subtotal $46,668.90 <br /> <br />Total Demolition $437,257.18 <br /> <br /> <br />Notes: 1) CDRMS, RN-03 Liability Calculations, Task 037, 5/13/08 <br />2) CDMG, TR-06 Liability Calculations, Task 037, 6/10/05 <br />3) Janet Binns, personal communiction, April 3, 2007 <br />4) Dave Winograski (certified MSHA electrician), personal communication, April 3, 2007 <br />5) Scott Dillon, Dillon Fencing and Contracting (fencing contractor used by HGTI), personal communication, September, 2007 <br />6) Cat 325C Loader costs, from CIRCES worksheets, April, 2005 <br />RN-03 <br />23-2.5 <br />Revised 06108 <br />
The URL can be used to link to this page
Your browser does not support the video tag.