Laserfiche WebLink
SHRUBS AND TREES (seedl <br />' TOTAL SEEDS / S0. FT.: 41.4 'TOTAL POUNDS PLS /ACRE : 13.00 'TOTAL SEED MIX COST I Acne : ~tfa.7S <br />Seed aoolication -method :Drill seeding (DMG survey data} TOTAL SEED APPLICATION COST !ACRE : $76.78 <br /> <br />MULCHING and MISCELLANEOUS <br />Materials -item no. 1 <br />-item no. 2 <br />- item no. 3 <br />- item no. 4 <br />DESCRIPTION (data source) UNITS /ACRE UNIT COST /UNIT COST /ACRE <br />Straw, delivered {DMG survey data} 2.00 ton $102.28 $204.56 <br /> <br /> <br /> <br />Aoolication -method no. 1 : Power mulcher (MEANS 32 91 13.16 0700) <br />-method no. 2 : Crimping, with trector (DMG survey data} <br />method no. 3 <br />TOTAL MULCH MATERIALS COST 1 ACRE : $204.56 <br />$65.78 <br />$5707 <br />TOTAL MULCH APPLICATION COST t ACRE : $122.85 <br />NURSERY STOCK PLANTING TYPE and SIZE <br />COMMON NAME NO. /ACRE (planting cost data source) MATERIAL <br />COST /PLANT PLANTING <br />COST /PLANT COST / FERT. <br />PELLET TOTAL <br />COST I PLANT TOTAL <br />COST /ACRE <br />No nursery stock required <br /> <br /> <br /> <br /> <br /> <br /> <br />TOTAL NURSERY STOCK COST/ ACRE : $0.00 <br />.. <br />JOB COST No. of acres . ~7.~® Cost /acre : $631.03 INITIAL JOB COST : $36,094.72 <br />Estimated failure rate (percent) : 20.00% Cost I acre': $488.37 RESEEDING JOB COST : $5,586.95 <br />`Selected replanting work items : S M TOTAL JOB COST : $49, 682 <br />• <br />RN-03 23-1.19 Revised 06/08 <br />__ <br />FORBS : sheet 2 of 2 <br />