Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 019 <br />Date : 05/30/2008 <br />User: JHB <br />State :Colorado <br />County : Routt Abbreviation :none <br />Site :Hg Load Out Filename :C081-019 <br />Agency or organization name :Division Of Reclamation, Mining And Safety <br />Permit or otherjob action :RN3 <br />Task description :dregrade 12~i! L®op Bond <br />................................................................................................................................................................................. <br />HOURLY~EQUIPMENT~COST::.~ :::...................................................................................................................................................................................... <br />Basic machine :Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $71.49 NA <br />Operating cost/hour : $103.27 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cost/hour : $32.78 NA <br />Total unit cost/hour : $207.53 Total fleet cost/hour : $207.53 <br />MATERIAL QUANTITIES' :::................................................................... ............................ ................................................................................................... <br />Initial Swell Loose <br />volume : 3,000 CCY factor : 1.125 volume : 3,375 LCY <br />Source of estimated volume :Division estimate (TR6) <br />Source of estimated swell factor :Caterpillar Handbook Edition <br />Average push distance : 150 feet <br />Unadjusted hourly production : 910.5 LCY/hr <br />Material consistency description <br />Compacted frll or embankment <br />Average push gradient : 0.00 % (~ <br />Average site altitude : 6,400 feet <br />Material weight : 2,650 Ibs/LCY <br />Weight description <br />Decomposed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factors Source <br />Operator skill : 0.75 (avg.) <br />Material consistency : 0.90 (Cat HB) <br />Dozing method : 1.00 (gen.) <br />Visibility : 1.00 (avg.) <br />Job efficiency : 0.83 (lshift/day) <br />Spoil pile : 0.80 (fnd-rt) <br />Push gradient : 1.00 (CatHB) <br />Altitude : 1.00 (Cat HB) <br />Material weight : 0.87 (Cat HB) <br />Blade type : 1.00 (S/SU/U) <br />Net correction : 0.39 <br />Adjusted unit production : 354.06 LCY/hr <br />Adjusted fleet production : 354.06 LCY/hr <br />• <br />• <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 9.53 Hours <br />Unit cost : $0.586 /LCY Total job cost : $1,978 <br />Permit/job# : C1992-081 <br />RN-03 2.3-1.12 Revised 06/08 <br />