Laserfiche WebLink
Rule 2 03 7 Statement that the Proposed Permit Area is Not Unsuitable for <br />Operations <br />On January 4, 1992, the Colorado Division of Minerals and Geology (then Colorado <br />Mined Land Reclamation Division) made the following findings with regard to the <br />H-G Coal Company Permit No. C-80-003 renewal, which included the Loadout facility <br />for which Hayden Gulch Terminal, Inc. sought a new permit (Source: Mining Permit <br />- Coal, Permit No. C-80-003, January 4, 1992): <br />RECITAL III.d) "Granting the permit will not conflict with any designation <br />decision issued pursuant to Section 522 of the Federal 'Surface Mining Control <br />and Reclamation Act of 1977,' as amended, (P.L. 95-87), nor is the area proposed <br />to be mined within an area under study for unsuitability designation in an <br />administrative proceeding commenced pursuant to Section 34-33-126 or Section 522 <br />of said P.L. 95-87." <br />On the basis of the above finding and information contained in the original <br />application package for Permit C-80-003 (Section 2.03.7, Volume 1), Hayden Gulch <br />Terminal, Inc. claims that the proposed permit area is not within an area <br />designated, or under study for designation, as unsuitable for surface coal mining <br />operations. <br />Rule 2.03.7(3) Ownership Waivers <br />There are no inhabitable dwellings within 300 feet of the Hayden Gulch coal <br />handling facility area. <br />Rule 2.03.8 Permit Term Information <br />On December 15, 1992, Hayden Gulch Terminal, Inc. executed the Asset Purchase <br />Agreement with H-G Coal Company and Axial Basin Ranch Company to purchase, along <br />with other assets, the Hayden Gulch Loadout. The Hayden Gulch Loadout facility <br />was included in H-G Coal Company Permit No. C-80-003. The H-G Coal Company <br />permit was initially issued by the Colorado Division of Minerals and Geology <br />(CDMG) on January 4, 1982. The Permit was successfully renewed on two occasions, <br />January 4, 1987 and January 4, 1992. <br />On December 14, 1992, Hayden Gulch Terminal, Inc. submitted a new permit <br />application to the CDMG covering only the Hayden Gulch Loadout. On May 22, 1°. 93, <br />the CDMG issued Hayden Gulch Terminal, Inc. a new permit covering only the Hayden <br />TR-07 9 Revised 03/06 <br />