Laserfiche WebLink
The Hayden Gulch Loadout Permit Renewal (RN-02) application was prepared by <br />• Hayden Gulch Terminal, Inc. with assistance from Peabody Energy Corporation <br />and MWH personnel. The individuals and organizations listed below provided <br />or presented the updated information in the RN-02 submittal. <br /> <br /> <br />Permit Renewal (RN-02) Preparation: <br />Tab 1, Permit Summary <br />Tab 2, General Policies <br />Tab 3, Adjudication File <br />Tab 18, Backfill and Grading <br />John C. Weinman (MWH) <br />Nick Kasperik (Peabody Energy) <br />John C. Weinman <br />Ron Cross (Peabody Energy) <br />John C. Weinman <br />John C. Weinman <br />The Hayden Gulch Loadout Technical Revision (TR-06) was prepared by Hayden <br />Gulch Terminal, Inc. with assistance from Peabody Holding Company, Inc. <br />(PHCI), Hydro-Environmental Solutions, Inc. (Hydro-Environmental) and <br />McVehil-MOnnett Associates, Inc. (MMAj personnel. The individuals and <br />organizations listed below provided or presented the updated information in <br />the TR-06 submittal. <br />Technical Revision (TR-06) Preparation: <br />Tab 1, Permit Summary <br />Tab 2, General Policies <br />Tab 3, Adjudication File <br />Tab 7, Hydrological Description <br />Tab 12, Facilities <br />Tab 13, Hydrologic Monitoring Plan <br />Tab 17, Reclamation Schedule <br />Tab 18, Backfilling and Grading <br />Tab 19, Reclamation Plan <br />Tab 22, Air Quality Control Plan <br />Tab 23, Bonding <br />Tab 24, Sign and Markers <br />TR-07 <br />John Weinman (Hydro-Environmental) <br />John Weinman <br />Ron Cross (PHCI) <br />John Weinman <br />John Weinman <br />John Weinman <br />Nick Doshi (PHCI) <br />Andy Gorun (PHCI) <br />John Weinman <br />John Weinman <br />John Weinman <br />PHCI <br />John Weinman <br />Brian Dunfee (PHCI) <br />John Weinman <br />Bill Monnett (MMA) <br />PHCI <br />John Weinman <br />2.2-2 <br />Revised 03/06 <br />