My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-12-03_PERMIT FILE - C1992081A (7)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1992081A
>
2008-12-03_PERMIT FILE - C1992081A (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:38:32 PM
Creation date
2/5/2009 1:25:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081A
IBM Index Class Name
Permit File
Doc Date
12/3/2008
Doc Name
Persons and Organizations Responsible for Preparation of Supplemental Technical Info
Section_Exhibit Name
Tab 02 Attachment 2-2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Hayden Gulch Loadout Permit Renewal (RN-02) application was prepared by <br />• Hayden Gulch Terminal, Inc. with assistance from Peabody Energy Corporation <br />and MWH personnel. The individuals and organizations listed below provided <br />or presented the updated information in the RN-02 submittal. <br /> <br /> <br />Permit Renewal (RN-02) Preparation: <br />Tab 1, Permit Summary <br />Tab 2, General Policies <br />Tab 3, Adjudication File <br />Tab 18, Backfill and Grading <br />John C. Weinman (MWH) <br />Nick Kasperik (Peabody Energy) <br />John C. Weinman <br />Ron Cross (Peabody Energy) <br />John C. Weinman <br />John C. Weinman <br />The Hayden Gulch Loadout Technical Revision (TR-06) was prepared by Hayden <br />Gulch Terminal, Inc. with assistance from Peabody Holding Company, Inc. <br />(PHCI), Hydro-Environmental Solutions, Inc. (Hydro-Environmental) and <br />McVehil-MOnnett Associates, Inc. (MMAj personnel. The individuals and <br />organizations listed below provided or presented the updated information in <br />the TR-06 submittal. <br />Technical Revision (TR-06) Preparation: <br />Tab 1, Permit Summary <br />Tab 2, General Policies <br />Tab 3, Adjudication File <br />Tab 7, Hydrological Description <br />Tab 12, Facilities <br />Tab 13, Hydrologic Monitoring Plan <br />Tab 17, Reclamation Schedule <br />Tab 18, Backfilling and Grading <br />Tab 19, Reclamation Plan <br />Tab 22, Air Quality Control Plan <br />Tab 23, Bonding <br />Tab 24, Sign and Markers <br />TR-07 <br />John Weinman (Hydro-Environmental) <br />John Weinman <br />Ron Cross (PHCI) <br />John Weinman <br />John Weinman <br />John Weinman <br />Nick Doshi (PHCI) <br />Andy Gorun (PHCI) <br />John Weinman <br />John Weinman <br />John Weinman <br />PHCI <br />John Weinman <br />Brian Dunfee (PHCI) <br />John Weinman <br />Bill Monnett (MMA) <br />PHCI <br />John Weinman <br />2.2-2 <br />Revised 03/06 <br />
The URL can be used to link to this page
Your browser does not support the video tag.