Laserfiche WebLink
<br />TRAPPE[t MIIdII~iG II~TC. <br />CRAIG, COLORADO <br />i~~+'~ <br />• <br />I, James M Mattem, a Registered Professional Engineer in the State of Colorado, in <br />accordance with 2CCR40T-2, Section 4.05.5(T), certify that East Pyeatt Dam No. 2 was <br />inspected by me during construction. Major construction activities commenced on <br />August 9, 1993 and were completed on September 10, 1993. <br />During construction, the dam was inspected daily to insure compliance with prudent <br />construction methods. Compaction was accomplished by laying Ell material in thin <br />layers with scrapers. A water truck and CAT B1S compactor were utilized for <br />moisture and compaction. Compaction and moisture content were monitored using a <br />nuclear density gauge. Standazd Proctor density was determined in our lab in <br />accordance with AASHO Standard Method T99-61. <br />The attached hydrologic modelling output accurately describes stage-storage <br />relationships. Please note that the last pond in the series (East Pyeatt No. 3) was <br />certified as East Pyeatt No. 2 in 1988. <br />s.., <br />J s M. Mattem <br />C lorado PE No. 2053T <br />9~?/S3 <br />Date <br />• <br />tnu~vmda•z~~s <br />eNG~ruMCS~r1M <br />