Laserfiche WebLink
"' <br />,, _ .r. <br /> <br />TRAPPER MTNING INC. <br />CRAIG, COLORADO <br />DAM CONSTRUCTION CERTIFICATION <br />I, Mark W. Wehmanen, a Registered Professional Engineer in the State of Colorado, in <br />accordance with 2CCR407-2, Section 4.05.6(7), certify that Sage Dam No. 2 was inspected by me <br />during construction. Major construction activities commenced on August 16, 1994 and were <br />completed on October 5,1994. <br />During construction, the dam was inspected daily to insure compliance with prudent construction <br />methods. Compaction was accomplished by laying fill material in thin layers with scrapers. A <br />water truck and Cat S15 compactor were used for moisture and compaction. Compaction and <br />moisture content were monitored using a nuclear density gauge. Standard Proctor density was <br />determined in our lab in accordance with AASHO Standard method T99-61. The dam was <br />conswcted as designed. <br />M W W/mg/9-27-93 <br />ENG/DAMCRTMW <br />