Laserfiche WebLink
Stleat 1 Of 2 <br /> <br />~~ <br />CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User: <br />Agency or organization name :Colorado Division 01 Minerals And Geology <br />yq1 State :Colorado PermiVob # :C1981-010 <br />11/182005 County:MofTat AbbreviaGon:none <br />JHB Site :Trapper Mine Fiiename:C010-241 <br />Permit or other job action : Tr 96 <br />Task desuipfion :Topsoil replacement on Coyote pond <br />_. <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />Cost Bn <br />Scraper work team -Scraper ~ Cat 637G w/push pull <br />-Push dozer:NA <br />Support equipment -Load area Cat D10R - 10SU <br />-Dump area •Cat D10R- 10SU <br />Road maintenance -Motor grader :CAT 140H <br />-Water truck :Water Tanker, 5,000 Gal. <br />rakdown : Suaper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scrapell NA dozer dozer grader misctruk <br />Utilization-machine . 100 NA 100 100 25 25 <br />-Ripper attachment: NA NA NA NA NA . NA <br />OwnerhipcostlFtour: $76.44 NA $60.00 $60.00 $17.37 $22.35 <br />OperatingcosUhour: $166.38 NA $124,54 $124.54 $8.70 $9.17 <br />Ripper op. cosUhour : NA NA $0.00 $0.00 $0.00 NA <br />Operator wsf/hour : $32. f5 NA $31.78 $31.78 $31.97 $21.16 <br />Unit subtotals : $274.97 NA $216.32 $216.32 $56.04 $52.68 <br />Number of units : 2 0 1 1 1 1 <br />Group subtotals : Work : $549.94 Support : $432.65 Maintenance : $108.73 <br />Total work team cosUhour : $1,091.31 <br />MATERfAL QUANTITIES <br />Initial Swell Loose <br />volume : 22,425 CCY factor : 1.125 volume : 25,228 LCY <br />Source of quantity take-oft :2004 ARR map 1 <br />Source of estimated swell factor :Caterpillar Handbook Edition 34 <br />1 _. <br />1 x <br />