My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-07-29_PERMIT FILE - C1981010A (11)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981010
>
2008-07-29_PERMIT FILE - C1981010A (11)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:35:02 PM
Creation date
2/5/2009 11:00:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010A
IBM Index Class Name
Permit File
Doc Date
7/29/2008
Section_Exhibit Name
Appendix A Circes Estimatating Forms
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I ~ BLASTING MATERIALS QUANTITIES <br />Total quantity of stemming requked <br />Total quantity of explosives required <br />of blasti <br />entity of <br />of prtmt <br />caps used per bla: <br />sting caps requires <br />used per blasthole <br />Task # : 128 <br />QUANTITY <br />-581.18 <br />1,456, 705 <br />47, 581 <br />2 <br />1594 <br />1 <br />sheet 2 of 2 <br />UNIT <br />Total quantity of primers required 772 diners <br />Quantity of delays used per blasthole 3 delay(s) <br />Total quantity of delays required 2320 delays <br />HOURLY EQUIPMENT COST Shin basis : 1 perday Data source (CRG data) <br />-Drill pad preparation : Cat D10R - 10SU <br />Misc. drilling support equipment :NA <br />Misc. explosives support equipment :NA <br />Farplosives delivery/prep. -Bulk truck :Fuel Tanker, 6x4, 210 HP <br />- Cao truck :Licht Dutv Pickuo. 4x4. 3/4 T. <br /> <br />Cost Breakdown : Drilling <br />Equipment Drill Pad <br />Preparation Misc. Drill Misc. Expl. <br />Support Support Explosives Delivery <br />Bulk Truck Cap Truck <br />Import data filename : drilling dozer NA NA misctruk misctruk <br />Utilization -machine+att. no. 1 : 100 100 NA NA 50 50 <br />-ripper or attachment no. 2 : NA NA NA NA NA NA <br />Equipment ownership$lhr: $15225 $60.81 NA NA $8.53 $3.38 <br />Machine+att. 1 operating$/hr: $406.38 $112.14 NA NA $11.83 $2.08 <br />Ripper or att. 2 operating $/hr : $0.00 $0.00 NA NA $0.00 $0.00 <br />Operetor+additionallabor$/hr: $19.26 $30.65 NA NA $29.76 $21.94 <br />Unit subtotals : $577.88 $203.60 $0.00 $0.00 $50.12 $27.38 <br />Number of units : 1 1 0 0 1 1 <br />Group subtotals : $577.88 $203.60 $0.00 $0.00 $50.12 $27.38 <br />Total work team cost/hour : 5859.00 <br />: _ :. ,: <br />MATERIALS COST <br /> Description Unit Unit Cost Quantity Total Cost <br />Blasting agent : uIkANFO nom. density pound $0.191 1,456,704.99 $278,230.65 <br />Primers or boosters : Cast primer, 2.016 each $5.111 772.00 $3,945.69 <br />Blasting caps : on-elecMccap, delay each $2.460 1,544.00 $3,798.24 <br />Jet. cord, /use or wire . etaline Detacard, 2.4 gr. linear/oot $0.099 47,581.05 $4,710.52 <br />Delays : S connectors each $3.477 2,320.00 $8,066.64 <br />Miscellaneous ~ one required NA $0.00 0.00 $0.00 <br />Drill bits' : bit life = 1,750.0 linear feet $2,844.00 11.41 $32,463.04 <br />L_~ <br />• na lire unn=linear root, ce cost unn =earn (cer oil) Total materials cost : $331,214.79 <br />DRILLING AND EXPLOSIVES PREPARATION TIME <br /> Job Condition Correction Factors - Site altitude : 7,100 feet <br /> Altitude adjustment : 0.95 (DMG est) <br />Total drilling length : 19, 976 linear feet Job efficiency factor : 0.67 (Ch. Exc. H8) <br />Unadjusted drilling rate : 160.00 feeVhour Adjusted drilling rate : 101.84 feeUhour <br />Drilling Dine : 196 15 hours Explosives prep trine 145.57 hours <br /> <br />JOB TIME AND COST i.;; <br />Total'ob time : _..: <br />341.72 ::: <br />hours <br />Total unit cost : $0.732 per cu. yd. Total job cost : $495,783 <br />P1v,.di ~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.