My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-07-29_PERMIT FILE - C1981010A (11)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981010
>
2008-07-29_PERMIT FILE - C1981010A (11)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:35:02 PM
Creation date
2/5/2009 11:00:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010A
IBM Index Class Name
Permit File
Doc Date
7/29/2008
Section_Exhibit Name
Appendix A Circes Estimatating Forms
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BLASTING MATERIALS QUANTITIES <br />Total quantity of stemming required <br />Total quantity of explosives required <br />Total quantity of det. cord/fuseAvire refit <br /> <br />Total quantity of blasting caps required 2472 caps <br />Quantity of primers used per blasthole 1 diner(s) <br />Total quantity of primers required 1236 rimers <br />Quantity of delays used per blasthole 3 delay(s) <br />Total cuantiN of delays required 3714 delavs <br />HOURLY EQUIPMENT COST <br />Drilling equipment -Drill <br />- Drill pad preparation <br />Misc. drifting support equipment <br />Misc. explosives support equipment <br />Explosives delivery/prep. -Bulk truck <br />- Cap truck <br />Shift basis : 1 per day Data source <br />ion <br />COPCO DMM2, 10-5/8 in. <br />R-fOSU <br />4x4. 1 <br />Cost Breakdown : Drilling <br />Equipment Drill Pad <br />Preparation Misc. Drill Misc. Expl. <br />Support Support Explosives Delivery <br />Bulk Truck Cap Truck <br />Import data filename : 'drilling dozer NA NA NA mischuk <br />Utilization -machine+att. no. 1 : 100 100 NA NA NA 50 <br />-ripper or attachment no. 2 : NA NA NA NA NA NA <br />Equipment ownership $/hr : $152.25 $60.00 NA NA NA $3.28 <br />Machine+att. 1 operating'$/hr: $406.38 $124.54 NA NA NA $2.37 <br />Ripper or att. 2 operating $thr : $0.00 $0.00 NA NA NA $0.00 <br />Operator+additionallabor$/hr: $38.52 $31.78 NA NA NA $19.49 <br />Unit subtotals : $597.14 $218.32 $0.00 $0.00 $0.00 $25.12 <br />Number of units : 1 1 0 0 0 1 <br />Group subtotals : $597.14 $218.32 $0.00 $0.00 $0.00 $25.12 <br />Total work team cosNhour : <br />MATERIALS COST <br /> Description Unit Unit Cost Quantity Total Cost <br />Blasting agent :BuIkANFO nom. density pound $0.191 567,227.27 $108,340.41 <br />Primers or boosters :Cast primer, 2.0Ib each $5.725 1,236.00 $7,076.10 <br />Blasting caps : on-electric cap, delay each $2.755 2,472.00 $6,810.36 <br />Det. cord, fuse or wire : etaline Detacord, 24 gr. linear foot $0.111 48,429.92 $5, 375.72 <br />Delays : S connectors each $3.894 3,714.00 $14,462.32 <br />Miscellaneous : one required NA $0.00 0.00 $0.00 <br />Drill bits' : bit life = 1, 750.0 linear feet $2,844.00 10.97 $31,201,44 <br />• bit lire untt = linear toot, bit cost unit = escn (per bit) Total materials cost : $173,266.35 <br />DRILLING AND EXPLOSIVES PREPARATION TIME <br /> Job Condition Correction Factors - Site altitude : 7,000 feet <br /> Altitude adjustment : 0.95 (DMG est) <br />Total drilling length : 19,199 linear feet Job efficiency factor : 0.67 (Ch. Exc. HB) <br />. Unadjusted drilling rate . <br />Dolling ttme 82 00 feeUhour <br />367.85 hours Adjusted dulling rate <br />Explostves prep time 52.19 feetAlour <br />222 <br />41 hours <br /> . <br /> <br />JOB TIME AND COST z <br />Total job time _.;:. _...:: <br />590.26 hours <br />Total unit cost : 51.812 per cu. yd. Total job cost : $478,088 <br />,7C <br />
The URL can be used to link to this page
Your browser does not support the video tag.