Laserfiche WebLink
BLASTING MATERIALS QUANTITIES <br />Total quantity of stemming required <br />Total quantity of explosives required <br />Total quantity of det. corti/fuseAvire regt <br />4uantity of blasting caps used per blast <br />Total quantity of blasting caps required <br />Quantity of primers used per blasthole <br /> <br />L <br />Shin basis : 1 per day <br />DMM2. 10-58 in. <br />Explosives deliverylprep. -Bulk truck :Fuel Tanker, 6x4, 210 HP <br />- Cao truck :Lioht Duty Pickup. 4x4. 1 T. <br />pUANTITY <br />2 <br />1760 <br />1 <br />880 <br />2 <br />1768 <br />Data source <br />sheet 2 of 2 <br />UNIT::::,.:.:.. <br />feet <br />Cost Breakdown : Drilling <br />Equipment Drill Pad <br />Preparation Misc. Grill Misc. Expl. <br />Support Support Explosives Delivery <br />Bulk Truck Cap Truck <br />Import data filename • drilling dozer NA NA misctruk misctruk <br />Utilization -machine+att. no. 1 : 100 100 NA NA 50 50 <br />-ripper or attachment no. 2 : NA NA NA NA NA NA <br />Equipment ownership $/hr : $152.25 $60.00 NA NA $8.40 $3.26 <br />Machine+att. 1 operating $/hr : $406.38 $124.54 NA NA $11.69 $2.37 <br />Ripper or att. 2 operating $/hr : $0.00 $0.00 NA NA $0.00 $0.00 <br />Operator+additionallabor$Rtr: $38.52 $31.78 NA NA $22.22 $19.49 <br />Unit subtotals : $597.14 $216.32 $0.00 $0.00 $42.31 $25.12 <br />Number of units • 1 1 0 0 1 1 <br />Group subtotals : $597.14 $216.32 $0.00 $0.00 $42.31 $25.12 <br />Total work team costmour : $880.90 <br />,: _.,.,. <br />MATERIALS COST <br /> Description Unit Unit Cost Quantity Total Cost <br />Blasting agent : Bulk ANFO nom. density pound $0.191 640,157.08 $122,270.00 <br />Primers or boosters : Cast primer, 2.0 Ib each $5.725 880.00 $5,038.00 <br />Blasting caps : on-electric cap, delay each $2.755 1,760.00 $4,848.80 <br />Det. cord, fuse or wire : etaline DetacoN, 2.4 gr linear loot $0.111 43,55707 $4,834.83 <br />Delays : MS connectors each $3.894 1,768.00 $6,884.59 <br />Miscellaneous : one required NA $0.00 0.00 $0.00 <br />Drill bits `: bit life= 1,750.0 linear feet $2,844.00 12.49 $35,514.79. <br />• bit life unit = linear toot, bit cost unit =each (per bit) Total materials Cost : S7 79,391.OT <br /> <br />DRILLING AND EXPLOSIVES PREPARATION TIME <br /> Job Condition Correction Factors - Site altitude : 7,200 feet <br /> Altitude adjustment : 0.95 (DMG est) <br />Total drilling length : 21,853 linear feet Job efficiency factor : 0.67 (Ch. Exc. HB) <br />Unadjusted drilling rate : 82.00 feeVhour Adjusted drilling rate : 52.19 feet/hour <br />Dnlltng time ~ 418.70 hours Explosives prep time : 165 17 hours <br />;. <br /> <br />J08 TIME AND COST <br />,: <br />7otaljob time : <br /> <br />583.87 ,. <br />_.. <br />hours <br />Total unit cost : $1.784 per cu. yd. Total job cost : $531,130 <br />'~ <br />Task # : 251 <br />