My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-07-29_PERMIT FILE - C1981010A (11)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981010
>
2008-07-29_PERMIT FILE - C1981010A (11)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:35:02 PM
Creation date
2/5/2009 11:00:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010A
IBM Index Class Name
Permit File
Doc Date
7/29/2008
Section_Exhibit Name
Appendix A Circes Estimatating Forms
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BLASTING MATERIALS QUANTITIES <br />Total quantity of stemming required <br />Total quantity of explosives required <br />Total nuantily of det. cordHuse/wire regt <br /> <br />Quantity of blasting caps used per blastholr <br />Total quantity of blasting caps required <br />Quantity of primers used per blasthole <br />Total quantity of primers required <br />Quantity of delays used per blasthole <br />Total quantity of delays required <br />HOURLY EQUIPMENT COST <br />Drilling equipment -Drill <br />- Drill pad preparation <br />Misc. drilling support equipment <br />Misc. explosives support equipment <br />Explosives delivery/prep. -Bulk truck <br />- Cao truck <br />Task # : 250 <br />Shift basis : i per day <br />> DMM2. 10-5/8 in. <br />D10R - <br />Flckup, 4x4, 1 <br />9.06 <br />sheet 2 of 2 <br />6,046 in. feet <br />2 cap(s) <br />320 caps <br />1 rimegs) <br />160 dmers <br />2 delay(s) <br />324 delays <br />Data source . (CRG dataj <br />Cost Breakdown : Drilling <br />Equipment Drill Pad <br />Preparation Misc. Drill Misc. Expl. <br />Support Support Explosives Delivery <br />Bulk Trucc Cap Truck <br />Import data filename : drilling dozer NA NA NA misctruk <br />Utilization -machine+att. no. 1 . 100 100 NA NA NA 50 <br />-ripper or attachment no. 2 : NA NA NA NA NA NA <br />Equipment ownership $/hr : $152.25 $60.00 NA NA NA $3.28 <br />Machine+att.loperating$/hr. $408.38 $124.54 NA NA NA $2.37 <br />Ripper or att. 2 operating $/hr : $0.00 $0.00 NA NA NA $0.00 <br />Operator+adddionallabor$/hr: $38.52 $31.78 NA NA NA $19.49 <br />Unit subtotals : $597.14 $216.32 $0.00 $0.00 $0.00 $25.12 <br />Number of units : 1 1 0 0 0 1 <br />Group subtotals . $597.14 $216.32 $0.00 $0.00 $0.00 $25.12 <br />Total work team cosUhour <br />r~ <br />LJ <br />MATERIALS <br /> Description Unit Unit Cost Quantity Total Cost <br />Blasting agent: uIkANFOnom.density pound $0.191 59,675.44 $11,398.01 <br />Primers or boosters . Cast primer, 2.0 Ib each $5.725 180.00 $916.00 <br />131asting caps : orr~lechic cap, delay each $2.755 320.00 $881.60 <br />Det. cord, fuse or wire : etaline DetacoM, 2.4 gr. linear /oot $0.111 8,045.60 $671.06 <br />Delays ~ S connectors each $3.894 324.00 $1,261.66 <br />Miscellaneous : one required NA $0.00 0.00 $0.00 <br />Drill bits': bit life= 1,750.0 linear feet $2,844.00 1.27 $3,814.32 <br />• pit life untt =linear root, Dit mst unft =each (per biq Total materials cost : $18, 742.64 <br />DRILLING AND EXPLOSIVES PREPARATION TIME <br /> Job Condition Correction Factors - Site altitude : 7,200 feel <br /> Altitude adjustment : 0.95 (DMG est.) <br />Total drilling length : 2,224 linear feet Job efficiency factor : 0.67 (Ch. Exc. HBJ <br />Unadjusted drilling rate : 82.00 feet/hour Adjusted drilling rate : 52.19 feeUhour <br />Drllmg time : 42.61 hours Explosives prep time : 28.57 hours <br />J_OB TIME AND COS7 Total job time : 71.18 hours <br />Total unit cost : $1.950 per cu. yd. Total job cost : $54,123 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.