My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-02-04_REPORT - M1980248
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980248
>
2009-02-04_REPORT - M1980248
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2019 10:22:08 AM
Creation date
2/4/2009 2:40:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980248
IBM Index Class Name
REPORT
Doc Date
2/4/2009
Doc Name
Annual Fee/Report/Map
From
Moffat County
To
DRMS
Permit Index Doc Type
Annual Fee/Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Annual Report <br />Moffat County Road and Bridge <br />Permit No.: M-1980-248 <br />Operation Name: Lyons Pit No. 2 <br />Date: January 19, 2009 <br />(Yes) (No) X A map is attached? <br />(Yes) (No) X New disturbances last year? <br />(Yes) (No) X New reclamation? <br />(Yes) (No) X New changes in map necessary? <br />(Yes) __ (No)_ X N_ew_map required? (See Note #1) <br />~ <br />(Yes) (No) X Specific plans for new disturbance next year? <br /> (See Notes # 1 & #2) <br />(Yes) (No) X Specific plans for new reclamation next year? <br /> (See Notes # 1 & #2) <br />Note #1: <br />Moffat County has an average inventory of 17 active gravel pits, and we have only one <br />crusher, which operates approximately 7 months out of the year. Typically, we expect <br />to have new disturbance in two gravel pits (or less) and occasional reclamation activity <br />in one. That means our only activity will be stockpile reduction and minor pit-run <br />excavation in at least 14 of our gravel pits each year. No new disturbances or <br />reclamation will have occurred during the previous year and no new changes to <br />the previous year's map are necessary. No new map is required. <br />Note #2: <br />Moffat County does not routinely make annual construction, mining and reclamation <br />plans for each pit. Our gravel activity each year is determined by necessity, emergency, <br />budget restraints, and resource availability. <br />Comments:
The URL can be used to link to this page
Your browser does not support the video tag.