My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-02-04_REPORT - C1981041 (2)
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981041
>
2009-02-04_REPORT - C1981041 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:43:24 PM
Creation date
2/4/2009 2:18:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
REPORT
Doc Date
2/4/2009
Doc Name
2008 Annual Hydrology Report
From
J.E. Stover & Associates, Inc
To
DRMS
Annual Report Year
2008
Permit Index Doc Type
Hydrology Report
Email Name
MPB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SNOWCAP COAL COMPANY <br />2008 ANNUAL HYDROLOGIC REPORT <br />OCTOBER 1, 2007 THROUGH SEPTEMBER 30, 2008 <br />Introduction <br />During the 2008 Water Year, the "Year", the mines were idle. Mining ceased at the Roadside <br />Portals on December 2, 1999. The North Mine was sealed on February 10, 2000. The <br />Roadside South Mine was sealed on April 12, 2000. The South Fan was sealed May 22, 2000. <br />The 2 West Portals were sealed on April 24, 2000. Production at the Roadside North utilized <br />room and pillar mining with a continuous miner and shuttle cars. <br />Reclamation of CRDA-2 was completed in 2002. The sediment retained by the drop structures <br />in Coal Canyon was harvested for cover material. Material excavated during construction of the <br />upper diversion ditch was also used as cover material. A small amount of cover material was <br />obtained from CBA-1. Topsoil was obtained from Topsoil Stockpiles 2, 7, 8 and 9. Reclamation <br />of CRDA-1 was also completed in 2002. Cover material was obtained from CBA-2. The road to <br />CRDA-1 was left open to accept coal and refuse material from other ongoing reclamation <br />activities. The road begins at the west end of Haul Rd No. 5 and extends to the top of CRDA-1. <br />The North Portal was regraded to approximate original contour during 2002. Backfill material <br />• came from areas filled near Coal Creek and around the coal stockpile area. <br />During 2002 the RSRDA was graded to final contours. The existing cover was graded off of the <br />slope and used as cover below the first bench. Refuse material was cut from the pile to <br />establish two 10' - 15' wide benches on 30' to 40' elevation intervals. This refuse material was <br />placed in an extension of the pile to the north. Cover material was obtained from the RSRDA <br />borrow area. <br />During 2003, a portion of the conveyor corridor was regraded and seeded. This work extended <br />from the culvert under Excel's frontage road to the culvert under the railroad loop. The conveyor <br />bridge over the Colorado River was removed during the year. <br />During 2004, the conveyor corridor, from the Xcel culvert south to Transfer Building #2 and east <br />of the Colorado River where the conveyor tube crossed the river, was graded to approximate <br />original contours and seeded. <br />No reclamation was performed in 2005 or 2006. <br />During 2007, a permit revision (PR-3) was approved to change the land use at the South Portal <br />from Fish and Wildlife to Industrial/Commercial. Final grading was completed for the approved <br />. reclamation plan. <br />During 2008, seeding was completed at the South Portal and the "G" Substation was removed, <br />graded to approximate original contours and seeded.
The URL can be used to link to this page
Your browser does not support the video tag.