My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-02-03_REVISION - C1981041 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981041
>
2009-02-03_REVISION - C1981041 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:43:22 PM
Creation date
2/4/2009 11:14:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
REVISION
Doc Date
2/3/2009
Doc Name
Proposed Decision Letter & Form
From
Snowcap Coal Company
To
DRMS
Type & Sequence
PR4
Email Name
MPB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />COLORADO <br /> <br />Phone: (303) 866-3567 D I V I S ION OF <br />RECLAMATION <br />FAX: (303) 832-8106 MINING <br /> <br /> SAF ETY <br />February 3, 2009 Bill Ritter, Jr. <br /> Governor <br />Tonya Hammond Harris D. Sherman <br />Snowcap Coal Company, Inc. Executive Director <br />P.O. Box 1430 Ronald W. Cattany <br /> <br />Palisade, CO 81526 Division <br />Director <br />Natural Resource Trustee <br />Re: Roadside Portals (Permit No. C-1981-041) <br />Proposed Decision <br />Permit Revision Application No. 4 (PR-4) <br />Dear Ms. Hammond: <br />Enclosed you will find the Division of Reclamation, Mining and Safety's Proposed Decision Package for Permit <br />Revision No. 4 at the Roadside Portals. Notice of the proposed decision will be published in the The Daily <br />Sentinel as soon as possible. The first publication will initiate the thirty (30) day public comment period for the <br />Division's decision. <br />Documentation must be submitted to the Division demonstrating that a copy of the approved revision application <br />was sent to the Office of Surface Mining and the Bureau of Land Management. The material should be sent within <br />15 days of final approval. <br />Please refer to the Performance Bond heading on the enclosed proposed decision form. If the amount of Bond <br />Held equals or exceeds the Revised Liability, you need not submit additional bond. However, if the Revised <br />Liability exceeds the Bond Held, please submit additional bond or rider to your existing bond that equals or <br />exceeds the Revised Liability. This Permit Revision must not be implemented until this proposed decision <br />becomes final and until any required increase in bond is submitted to and approved by the Division. <br />If you have any questions, please contact me. <br />Sincerely, <br />'.?? r??z <br />f <br />Michael P. Boulay <br />Environmental Protection Specialist <br />Enclosure(s) <br />C-PR-08 C198104I MPB 02032009020328.doc <br />Office of Office of <br />Mined Land Reclamation Denver • Grand )unction • Durango Active and Inactive Mines
The URL can be used to link to this page
Your browser does not support the video tag.