Laserfiche WebLink
Soil name I Hydrologic Soil Group <br />Burnett loam C <br />Campsass B <br />Work loam C <br />This completes the preliminary adequacy review of Technical Revision 78. The <br />proposed decision date for this revision is 6 March 2009. Colowyo's prompt response to <br />the above questions and comments will help ensure that this decision date is met. Please <br />call me at (303) 866-3456 X8145 if you have any questions. <br />Sincerely, <br />James R. Stark <br />Environmental Protection Specialist <br />cc: Sandy Brown