My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-02-03_GENERAL DOCUMENTS - C1981041
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981041
>
2009-02-03_GENERAL DOCUMENTS - C1981041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2020 1:05:43 PM
Creation date
2/4/2009 11:11:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
2/3/2009
Doc Name
Proposed Decision & Findings of Compliance for PR4
From
Unit Train Loadout
Permit Index Doc Type
Findings
Email Name
MPB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Two small sumps were constructed in the North Decline reclamation area and one sump was <br />constructed in the Cameo Borrow Area #1 (CBA-1). to serve to capture and treat runoff from <br />reclaimed lands. These sumps are adequately sized to contain runoff from a 25-year, 24-hour <br />storm event. <br />F. Surface and Groundwater Monitoring <br />1. The permittee will conduct monitoring of groundwater in a manner approved by the <br />Division. The groundwater monitoring plan is detailed in Tab 18 of the permit application. <br />Piezometers have been installed in various permit area locations to monitor water level <br />and/or quality in alluvium, refuse fill, the Rollins Sandstone and abandoned sections of the <br />South Portals Mine. Monitoring locations are shown on "Roadside and Cameo No.1 <br />Mines Hydrologic Monitoring Map" (Exhibit 56), in Tab 18. The groundwater <br />monitoring plan is outlined below; for additional detail refer to Tab 18 of the approved <br />permit. (4.05.13(1)) <br />Rapid Creek and Cottonwood Creek Piezometers <br />GWMS-OIA, 01B, 02A, 02B, 03A, and 03B, monitor water levels May and September. <br />CRDA Piezometers <br />CRDA-01 through 03, and O1 A; and thirty piezometers (Pz 100-107, 200-206, 300-307, <br />and 400-406), all on CRDA-1, monitored quarterly for water level. "Critical levels" <br />defined for 100, 200, 300, and 400 series piezometers. <br />CRDA-04 through 06 installed on CRDA-2, monitored quarterly for water level. <br />Unit Train Loadout Piezometers <br />Quarterly water level monitoring UTL-01,02,03,04; <br />Annual water quality monitoring UTL-02 and UTL-04 (parameters listed in Permit Table <br />18-3) <br />Roadside South Portal Workings <br />Well N-1, located at reclaimed North Decline; quarterly water level monitoring. <br />Rollins Sandstone Wells <br />Rollins-2 (At UTL) <br />Rollins-3 (Near Pond 7, North Decline) <br />Quarterly water levels and Annual water quality analyses (Table 18-3) required for Rollins <br />Wells. Monitoring of in-mine wells (Rollins-1 and Rollins-4) has been discontinued <br />because the portals have been sealed and the wells are therefore no longer accessible. <br />Permit Revision No. 4 24 February 3, 2009
The URL can be used to link to this page
Your browser does not support the video tag.