My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-10-22_REVISION - C1981014 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981014
>
2007-10-22_REVISION - C1981014 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:18:11 PM
Creation date
2/3/2009 2:58:22 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
REVISION
Doc Date
10/22/2007
Doc Name
Southfield 2007 Midterm Review Cost Estimate
Section_Exhibit Name
Exhibit 20-New
Email Name
KAG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROAD ABLE EQUIPMENT sheet 2 of 2 <br />Nearest major city or town within project area region : Canon City <br />Transportation Cycle Time : Non- Total one-way travel distance : 25.0 miles <br />Roadable Roadable Average travel speed : 45.0 mph <br />Equipment Equipment <br />Haul time (hours) _ <br />Return time (hours) _ <br />Loading time (hours) _ <br />Unloading time (hours) _ <br />Subtotals = <br />JOB TIME AND COST <br />0.56 0.56 Total non-roadable mob/demob cost " : $3,235.02 <br />0.56 0.56 " two round trips with haul rig <br />1.25 NA Total roadable mob/demob cost "" : $0.00 <br />1.25 NA one round trip, no haul rig <br />3.61 1.11 <br />Total job time : 7.22 hours <br />Total job cost : $3,235 <br />I'Rg 1-611,17 <br />EQUIPMENT HAUL DISTANCE and TIME
The URL can be used to link to this page
Your browser does not support the video tag.