Laserfiche WebLink
...... <br />HOURLY PRODUCTION sheet 2 of 2 <br />Hauling Capacity : <br />Scraper Pavload (weight) Basis : Scraper Bowl (volume) Basis : <br />Material weight : 2,550 pounds/LCY <br />Material description <br />Earth - Dry packed <br />Rated payload : 48, 000 pounds <br />Payload capacity : 18.82 LCY <br />Cycle Time : <br />Scraper loading time * : 0.90 <br />Maneuver and spread time : 0.60 <br />* load time per scraper pair on push-pull models <br />Struck volume : 14.00 LCY <br />Heaped volume : 20.00 LCY <br />Average volume : 17.00 LCY <br />Adjusted capacity : 17.00 LCY *** <br />hourly production reflects volume per scraper pair on push-pull models <br /> Job Condition Corrections : Site altitude (ft.) : 6,100 <br /> Scraper Push dozer Source <br />minutes Altitude adj.: 1.000 NA (Cat HB) <br />minutes Job efficiency : 0.830 NA (Cat HB) <br /> Net correction : 0.830 NA <br />Travel time : <br />Road condition description :Firm, smooth, rolling, dirt/It. surfaced, watered, maintained <br />Haul Route : <br />Seg. # Haul distance (feet) Grade (%) Roll. res. (%) Total res. (%) Velocity (fpm) Travel time (min.)** <br />1 3,960 -4.00 3.00 -1.00 2938 1.39 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Haul time : 1.39 minutes <br />Return route : <br />travel time for each segment is adjusted for acceleration/deceleration. Return time : 1.71 minutes <br />table velocities are max. attainable per total resistance shown, not average <br />Total scraper team cycle time (load + haul + maneuver and spread + return) : 4.60 minutes <br />Unadjusted unit production/hour : 443.36 LCY/hour *** Adjusted for job conditions : 367.99 LCY/hour <br />Optimal number of scrapers per push dozer : NA Selected number of scrapers : 2 scraper(s) <br />Adjusted single scraper team (unit) hourly production : 367.99 LCY/hour <br />Adjusted multiple scraper team (fleet) hourly production : 367.99 LCY/hour <br />/b-7O07