Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User <br />Permit or other job action : 2007 Midterm Review <br />Task description :Replace Topsoil from Stockpile M-1 to Facilities Area <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />Cost Bre <br />Description <br />Scraper work team -Scraper : Cat 627G w/push pull <br />-Push dozer:NA <br />Support equipment -Load area :NA <br />-Dump area :NA <br />Road maintenance -Motor grader : CAT 14H <br />-Water truck : Water Tanker, 2, 500 Gal. <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA NA NA grader misctruk <br />% Utilization-machine : 100 NA NA NA 50 50 <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cost/hour : $60.47 NA NA NA $32.63 $7.50 <br />Operating cost/hour : $119.18 NA NA NA $20.46 $7.33 <br />Ripper op. cost/hour : NA NA NA NA $0.00 NA <br />Operator cost/hour : $24.95 NA NA NA $24.47 $34.24 <br />Unit subtotals : $204.60 NA NA NA $77.56 $49.07 <br />Number of units : 2 0 0 0 1 1 <br />Group subtotals : Work : $409.20 Support : $0.00 Maintenance : $126.63 <br />Total work team cost/hour : $535.83 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 10,400 CCY factor : 1.125 volume : 11,700 LCY <br />Source of quantity take-off :Map 14 and Pages 2.05.3-60 and 2.05.3-60a <br />Source of estimated swell factor : CAT Handbook <br />Agency or organization name : Colorado Division Of Minerals And Geology <br />043 State :Colorado Permit/job #: C-81-014 <br />0611112007 County : Fremont Abbreviation :.none <br />JRS Site : Southfield Mine Filename : C014-043 <br />MK-5-5S 161-2667