My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-01-28_PERMIT FILE - M2009004
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2009004
>
2009-01-28_PERMIT FILE - M2009004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:43:10 PM
Creation date
2/3/2009 2:56:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009004
IBM Index Class Name
PERMIT FILE
Doc Date
1/28/2009
Doc Name
Response
From
OSE
To
DRMS
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEPARTMENT OF NATURAL RESOURCES <br />DIVISION OF WATER RESOURCES <br />Response to Reclamation Permit Application Consideration <br />Bill Ritter, Jr. <br />Governor <br />Harris D. Sherman <br />Executive Director <br />Dick Wolfe, P.E. <br />Director <br />DATE: January 28, 2009 <br />TO: Berhan M. Keffelew, Environmental Protection Specialist- <br />CC: Division 2 Office; District 10 Water Commissioner RECEIVED <br />FROM: Sarah Reinsel, E.I.T. <br />?? ?AN 2 8 2009 <br />RE: South Asphalt Plant, File No. M-2009-004 <br />Operator: Rocky Mountain Materials & Asphalt, Inc. /g Division of Keaamation. <br />Contact: Robert P. Mangone Mining and Safety <br />Section 3, Twp 15S, Rng 66W, 6th P.M., El Paso County <br />CONDITIONS FOR APPROVAL <br />® The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground <br />water must not occur during or after mining operations. If stormwater is contained on-site, it must <br />infiltrate into the ground or be released to the natural stream system within 72 hours, or all work <br />must cease until a substitute water supply plan, or augmentation plan approved by water court, is <br />obtained. Reclamation plans must ensure water will not be retained onsite for more than 72 hours <br />unless an augmentation plan approved by water court is obtained. <br />? The proposed operation will consume ground water by: E] evaporation, ? dust control, <br />? reclamation, ? water removed in the mined product, ? processing, ? other:. <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a gravel pit <br />or other type of well permit, as applicable. However, prior to obtaining a permit, an approved water <br />supply plan or decreed plan for augmentation is required. <br />? Prior to approving a well permit, the applicant must conduct a field inspection of the site and <br />document the locations of all wells within 600 feet of the permit area. The applicant must then <br />obtain a waiver of objection from all well owners with wells within 600 feet of the permit area or <br />request a hearing before the State Engineer. <br />? Other: <br />COMMENTS: A specific water information summary was not provided in support of this application. This <br />is proposed to be a surface mining operation. No additional water diversions or impoundments are planned <br />for the site. The existing stormwater management plan for the site is not expected to be effected by this <br />mining operation. <br />Office of the State Engineer <br />1313 Sherman Street, Suite 818 • Denver, CO 80203 • Phone: 303-866-3581 • Fax: 303-866-3589 <br />www.watenstate.co.us
The URL can be used to link to this page
Your browser does not support the video tag.