Laserfiche WebLink
.. <br />ROADABLE EQUIPMENT sheet 2 of 2 <br />Nearest major city or town within project area region : Canon City <br />Transportation Cycle Time : Non- Total one-way travel distance : 25.0 miles <br />Roadable Roadable Average travel speed : 45.0 mph <br />Equipment Equipment <br />Haul time (hours) = <br />Return time (hours) = <br />Loading time (hours) = <br />Unloading time (hours) = <br />Subtotals = <br />JOB TIME AND COST <br />0.56 0.56 Total non-roadable mob/demob cost * : $3,235.02 <br />0.56 0.56 * two round trips with haul rig <br />1.25 NA Total roadable mob/demob cost ** : $0.00 <br />1.25 NA one round trip, no haul rig <br />3.61 1.11 <br />Total job time : 7.22 hours <br />Total job cost : $3,235 <br />I'Ilg -5S 1-61107 <br />EQUIPMENT HAUL DISTANCE and TIME