Laserfiche WebLink
X. x <br />ROADABLE EQUIPMENT sheet 2 of 2 <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br />-Water Tanker, 2,500 Gal. $56.40 1 $56.40 $56.40 <br />-Flatbed Truck, 6x4, 45K GVW $116.26 1 $116.26 $116.26 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $172.66 $172.66 <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town within project area region : Canon City <br />Transportation Cycle Time : Non- Total one-way travel distance : _25 <br />0 mil <br /> . <br />es <br /> Roadable Roadable Average travel speed : 40.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 0.62 0.62 Total non-roadable mob/demob cost' : $5,703.57 <br />Return time (hours) = 0.62 0.62 * two round trips with haul rig <br />Loading time (hours) = 0.50 NA Total roadable mob/demob cost ** • $215.82 <br />Unloading time (hours) = 0.50 NA *• one round trip, no haul rig <br />Subtotals = 2.25 1.25 <br /> <br /> <br />JOB TIME AND COST <br />Total job time : .:. < .......:..::. . <br />4.50 hours <br /> Total job cost : $5.919 <br />/yl/Z-S? io/y?7