Laserfiche WebLink
t <br />v <br />PROJECT IDENTIFICATION <br />Date <br />Da 12-Jun-07 ;Permit IC-1981-01 4 1Site: Southfield Mine <br /> <br />- <br />User <br />-- - JRS i <br />State :Colorado <br /> jFilename: _ <br />]C018-000 (Conn Fremont <br /> <br />A <br />gency Name: Colorado Division of Reclamation Mining and Safe - <br />? <br />J- - - -- -- <br />Permit Action: 2007 Midterm Review <br /> <br />Task Task Description <br />Task - - (TASK HOURS <br /> <br />I jDIRECT COST <br />011 !Replace Topsoil from Stockpile to Refuse Pile 28.23 <br />1$15,124 <br />035 ;Backfill and Regrade Pond 4 j 38.37 <br />$7,848 <br />036 - ,Backfill and Regrade Pond 5 7.06 $1,445 --- ------ <br />037 ;Backfill and Regrade Pond L-1 - - 5.15 $1,054 <br />_ <br />038 ;Backfill and Regrade Pond L-2 0.99 3203 <br />041 - <br />Replace Topsoil from Stockpile L1 to East Loadout <br />- -- <br /> <br />- 1 --- <br /> <br />-- 8.63 <br /> <br />l <br />- $4,624 <br /> <br />._ <br />-- - <br />042 -Re lace To soil fr <br /> <br />p p om Stockpile L2 to West Loadout <br />- <br />_ <br />11 18 <br /> <br />i - <br /> <br />$5 991 <br />043 - <br />'Rep lace Topsoil fr om Stockpile M-1 to Facilities Area <br />- _ <br />--- - 19.30 1 $10,342 <br />044 !Replace Topsoil from Newlin Creek Stockpile to Facilities Area - <br />-- <br />- 18.34 i $12,152 <br /> <br /> <br />45 <br />0 <br /> <br />!Replace Topsoil from Stockpile M-3 to Ponds 3 and 4 <br /> <br />9.21 <br /> <br />1 _ <br /> <br />$4,937 <br />046 <br />Replace Topsoil from Newlin Creek Stockpile to Ponds 3 and 4 <br />i <br />1 <br />4.56 - <br />$2,446 <br />053 - <br />Seal All Wells and Boreholes ! 1 36.00 $8,221 <br />060 Demolish and Remove All Structures _ <br />j 1 125.00 $19,314 - ----- <br />065 Reseed Facilities and Loadout Area 125 6 <br />0 <br />$55,814 <br />066 Reseed Areas of Refuse Pile Previoulsy Seeded 1 60.00 <br />$15,116 <br />067 ant rubs and Trees on Facilities Area <br />- - - - -- - -- <br />- -- <br />! ' <br />1 <br />39_60 <br />$7,449 <br /> <br />068 <br />Plant Shrubs and Trees on Refuse Pile - - <br />- - - -- --- <br />- ----- <br />72.00 - -- -- <br />$4222 <br />------ <br />------ <br />069 j <br />Plant <br />Trees at Loadout 1 0.2 1 $245 <br />070 Site Maintenance - 120.00 $7,861 <br /> <br />073 <br />;Mobilize/Demobi lize Equipment for Remaining Reclamation <br />4 50 <br />; _ <br />$5,919 <br /> <br />074 <br />;Mobilize/Demobilize Equipment for Site Maintenance <br />1 - <br />7.22 -__ <br />$3,235 <br /> i <br />i <br /> <br />I <br />' <br /> 1 - <br />--- -' - - - - - - -- - - - -- - - -- - - - - - 1 -- <br />-- -- - <br /> Direct Cost Total 1 771.14 $193,562 <br />jrs <br />Page 1 <br />6/12/2007