My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-02-03_REVISION - C1981014 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981014
>
2009-02-03_REVISION - C1981014 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:43:22 PM
Creation date
2/3/2009 2:56:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
REVISION
Doc Date
2/3/2009
Doc Name
Correction to Decision Form
From
DRMS
To
Energy Fuels Coal Inc
Type & Sequence
MR55
Email Name
KAG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HOURLY PRODUCTION sheet 2 of 2 <br />Hauling Capacity : <br />Scraper Payload (weight) Basis : Scraper Bowl (volume) Basis : <br />Material weight : 2,550 pounds/LCY Struck volume : 14.00 LCY <br />Material description : Heaped volume : 20.00 LCY <br />Earth - Dry packed Average volume : 17.00 LCY <br />Rated payload : 48,000 pounds Adjusted capacity : 17.00 LCY *** <br />Payload capacity : 18.82 LCY hourly production reflects volume per scraper pair on push-pull models <br />Cycle Time : <br />Scraper loading time * : 0.90 minutes <br />Maneuver and spread time : 0.60 minutes <br />* load time per scraper pair on push-pull models <br />Travel time : <br />Road condition description :Firm, smooth, rolling, dirt4t. surfaced, watered, maintained <br />Haul Route : <br />Seg. # Haul distance (feet) Grade (%) Roll. res. (%) Total res. (%) Velocity (fpm) Travel time (min.)** <br />1 600 -6.00 3.00 -3.00 2938 0.27 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Haul time : <br />Return route 0.27 minutes <br />1 600 6.00 3.00 9.00 1930 0.40 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />" travel time for each segment is adjusted for acceleration/deceleration. Return time : <br />table velocities are max. attainable per total resistance shown, not average <br />Total scraper team cycle time (load + haul + maneuver and spread + return) : <br />Unadjusted unit production/hour : 942.39 LCY/hour *** Adjusted for job conditions : <br />Optimal number of scrapers per push dozer : NA Selected number of scrapers : <br />Adjusted single scraper team (unit) hourly production : <br />Adjusted multiple scraper team (fleet) hourly production : <br />JOB TIME AND COST <br />Fleet size : 1 Team(s) Total job time : <br />Unit cost : $0.685 /LCY Total job cost : 0.40 <br /> <br />2.16 <br />782.19 <br />2 <br />782.19 <br />782.19 <br /> <br />8.63 <br />$4,624 minutes <br /> <br />minutes <br />LCY/hour <br />scraper(s) <br />LCY/hour <br />LCY/hour <br /> <br />Hours <br />.Job Condition Corrections : Site altitude (ft.) : 6,100 <br /> Scraper Push dozer Source <br />Altitude adj.: 1.000 NA (Cat HB) <br />Job efficiency : 0.830 NA (Cat HB) <br />Net correction : 0.830 NA <br />4hR-55? 1617,ao7
The URL can be used to link to this page
Your browser does not support the video tag.