Laserfiche WebLink
-6- <br />2. The Board may suspend or revoke this permit, or assess a civil penalty, upon a finding that the permittee <br />violated the terms or conditions of this permit, the Act, the Mineral Rules and Regulations, or that information <br />contained in the application or your permit misrepresent important material facts; <br />3. If your mining and reclamation operations affect areas beyond the boundaries ofan approved permit boundary, <br />substantial civil penalties, to you as permittee can result; <br />4. Any modification to the approved mining and reclamation plan from those described in your approved <br />application requires you to submit a permit modification and obtain approval from the Board or Office; <br />1 5. It is your responsibility to notify the Office of any changes in your address or phone number; <br />6. Upon permit issuance and prior to beginning on-site mining activity, you must post a sign at the entrance of the <br />mine site, which shall be clearly visible from the access road, with the following information (Rule 3.1.12): <br />a. the name of the operator; <br />b. a statement that a reclamation permit for the operation has been issued by the Colorado Mined Land <br />listed in your application, as well as with the provisions of the Act and the Construction Material Rules and <br />Regulations in effect at the time the permit is issued. <br />9. Annually, on the anniversary date of permit issuance, you must submit an annual fee as specified by Statute, <br />and an annual report which includes a map describing the acreage affected and the acreage reclaimed to date (if there <br />are changes from the previous year), any monitoring required by the Reclamation Plan to be submitted annually on <br />the anniversary date of the permit approval. Annual fees are for the previous year a permit is held. For example, a <br />permit with the anniversary date of July 1, 1995, the annual fee is for the period of July 1, 1994 through June 30, <br />1995. Failure to submit your annual fee and report by the permit anniversary date may result in a civil penalty, <br />revocation of your permit, and forfeiture of your financial warranty. It is your responsibility, as the permittee, to <br />continue to pay your annual fee to the Office until the Board releases you from your total reclamation responsibility. <br />10. For joint venture?artnershiRoverators: the signing representative is authorized to sign this document and a <br />- power of attorney (provided by the partner(s)) authorizing the signature of the representative is attached to this <br />application. <br />Reclamation Board; and, <br />c. the permit number. <br />n' <br />Y . The boundaries of the permit boundary area must be marked by monuments or other markers that are clearly <br />visible and adequate to delineate such boundaries prior to site disturbance. <br />78. It is a provision of this permit that the operations will be conducted in accordance with the terms and conditions