Laserfiche WebLink
Colowyo Mine <br />TR-72 PAR3 <br />29 January 2009 <br />Page 6 of 8 <br />Loadout. This Technical Revision will be submitted no later than 31 August 2012 or <br />sooner if reclamation of the Gossard Loadout is scheduled prior to this date. <br />Planting and Seeding Methods in amended Section 2.05.4 <br />16. Item Resolved in first adequacy review. <br />Mulching Techniques in amended Section 2.05.4 <br />17. Colowyo has amended the text on pages 2.05-61 and 4.15-3 as requested. Colowyo has <br />committed to install contour furrows on slopes greater than 10%, with frequency <br />dependent on slope grade, though specific frequency is not committed to. Text on <br />page 2.05-47 provides more specification for furrow construction, with spacing to <br />vary, but "approximately 10 to 20 feet along the slope". While there is still some <br />leeway in the plan, as written, the Division understands the need for flexibility in such a <br />plan. The Division considers this Item Resolved. <br />Pest and Disease Control in amended Section 2.05.4 <br />18. Item Resolved in first adequacy review. <br />Postmining Land Use (2.05.5 and 4.161 <br />19. Item Resolved in first adequacy review. <br />Fish and Wildlife Plan [2.05.6(2) and 4.181 <br />20. Item Resolved in first adequacy review. <br />21. Item Resolved in first adequacy review. <br />22. Item Resolved in first adequacy review. <br />Rule 4.15 Revegetation Performance Standards <br />23. The Division requested that the first sentence of amended page 4.15-3 be amended to <br />clarify that the post-2008 seed mixes were limited to native species "with limited and <br />specified exceptions". The sentence was properly amended. Item Resolved. <br />24. Colowyo has amended the text on pages 2.05-61 and 4.15-3 as requested. While there is <br />still some leeway in the plan, as written, the Division understands the need for flexibility <br />in such a plan. The Division considers this Item Resolved. <br />25. Item Resolved in first adequacy review.