Laserfiche WebLink
.y <br />Colorado Division of Reclamation, Mining and Safety <br />Annual Reclamation Resort for the Year 2ooP <br />Elk Crcclc- IIVVe <br />?' <br />mine name <br />Address: !f 0 <br />C- 1981 - 0Z--- <br />S`39. 3 ? 3 7 <br />permit # <br />IaJAY 133 , SowtA <br />d xl??, I,VI l n UC. <br />Permitte <br />" 8iy3y <br />This report, required by Rule 2.04.13, is due by February 15 of each year, or other date, as agreed upon <br />by the Division. It should include text, discussion, and maps, at a minimum, in addition to any other <br />reclamation monitoring data as required by the approved permit. The location of the acreage reported <br />under each land status category and year of seeding (if applicable) should be clearly and accurately <br />identified on a map included with the report. <br /> <br />Land Status Category Last Years <br />Cumulative Total This Calendar <br />Year <br />Cumulative Total' <br />Acres disturbed /S8, 26 rc% + 0. Z <br />Acres backfilled and graded + Z, 07 S?, b Z- <br />Acres to soiled S6.55 + Z, 07 = S 8 . G Z- <br />Seeding typically begins the minimum 10-year reclamation liability period. Please report the acres for <br />.,.k n?4ennni b,cln- rln nn4 irv+hirlc nrrac 4hmi hava nrrhiavari final Phase III rPIPacP <br /> Last Years This Greater <br /> Cumulative Calendar Cumulative 10 years or than 10 <br /> Total year Total' less ears' <br />Acres seeded* S'& • S S + Z' a 7 = S'A?. 6 Z- = S3,67- + S'. (o <br />"include, it necessary, a description of any augmentea seeamg or cultural pracuces <br />For the Entire Life of Mine, the total number of acres disturbed s?• 52- and the total number of acres: <br />Phase I released 0 Phase 11 released 6 Phase III released U <br />For Mines in Permanent Cessation: <br />Total acreage in facilities subject to reclamation but yet to be completed N /9 <br />For Government Performance and Results Act <br />Acreage in long-term mining or reclamation facilities 2 IS8 • $ Z' <br />Acreage in active mining areas 3 <br />(exclude acres where Phase III release has been achieved) <br />s Includes haul and access roads; temporary dams and impoundments; permanent dams and impoundments; diversion and <br />collector ditches, water and air monitoring sites; topsoil stockpiles; overburden stockpiles; repair, storage and construction areas; <br />office area, repair shops, and parking; coal stockpiles, loading, and processing areas; railroads; coal conveyors; nonbackfilled and <br />graded areas of refuse piles, coal mine waste impoundments, head-of-hollow fills, and valley fills; ventilation shafts and entryways; <br />and noncoal waste disposal area (garbage dumps and coal combustion by-products disposal areas). <br />iN 14 <br />3 Includes pits, topsoil stripped areas in advance of pits, and spoil not backfilled and graded