Laserfiche WebLink
RULE 2 PERMITS <br />• 2.04.12 Prime Farmland Investigation <br />The presence of potential prime or important farmlands within the Collom permit expansion area was <br />determined based on a reconnaissance inspection and a request by Colowyo to the U.S Department of <br />Agriculture - Natural Resources Conservation Service (MRCS) in 2002 of prime farmland determination <br />for the Collom permit expansion area. The land has not historically been used as cropland, and soil <br />surveys of the area did not designate any soil map units classified as prime or important farmland. <br />Results of the investigation indicate that all of the area potentially disturbed by surface operations or <br />associated facilities can be excluded as prime or important farmland. Based upon the information <br />presented in this section, a negative determination for the existence of prime farmland within the permit <br />boundary has been concluded. <br />2.04.13 Annual Reclamation Report <br />Colowyo has been and will continue to submit annual reclamation reports for all permitted mining areas. <br />i <br /> <br />Collom - Rule 2, Page 84 Revision Date: 1/23/09 <br />Revision No.: PR-03