My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-11-29_REVISION - C1980005
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980005
>
2007-11-29_REVISION - C1980005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:18:54 PM
Creation date
1/29/2009 8:40:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
REVISION
Doc Date
11/29/2007
Doc Name
Revised Reclamation Cost Estimate
From
Susan Burgmaier
To
Mike Boulay
Type & Sequence
SL2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F <br />I g -z' <br />:::::::::::•::.::::::.:::::::v::::::::::::::4;^is4:w::4i:+Li;:^;•:oi?i?i}:«:4;:^::>Yi;hi?i:+4i::tLi::::::::i:L4i:i{O>::>:::::: :i Y :ii222:i::i;::i......: :i: :....i::i::::i: 4iii:a <br /> :i: :i::i: <br />HOURLY PRODUCTION sheet 2 of 2 <br />Hauling Capacity : <br />Scraper Payload (weight) Basis : Scraper Bowl (volume) Basis <br />Material weight : 2,075 pounds/LCY <br />Material description : <br />USER-PROVIDED WEIGHT DATA <br />Rated payload : 75,000 pounds <br />Payload capacity : 36.14 LCY <br />Cycle Time : <br />Scraper loading time * : 1.00 minutes <br />Maneuver and spread time : 0.60 minutes <br />* load time per scraper pair on push-pull models <br />Travel time : <br />Road condition description : USER-PROVIDED ROLLING RESISTANCE FACTOR <br />Haul Route : <br />Seg. # Haul distance (feet) Grade (%) Roll. res. (%) Total res. (%) Velocity (fpm) Travel time (min.)** <br />1 500 0.00 4.00 4.00 2394 0.41 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Return route : <br />Haul time : 0.41 minutes <br />** travel time for each segment is adjusted for acceleration/deceleration. Return time : 0.35 minutes <br />table velocities are max. attainable per total resistance shown, not average <br />Total scraper team cycle time (load + haul + maneuver and spread + return) : 2.36 minutes <br />Unadjusted unit production/hour : 1,577.31 LCY/hour *** Adjusted for job conditions : 1,309.17 LCY/hour <br />Optimal number of scrapers per push dozer : NA Selected number of scrapers : 2 scraper(s) <br />Adjusted single scraper team (unit) hourly production : 1,309.17 LCY/hour <br />Adjusted multiple scraper team (fleet) hourly production : 1,309.17 LCY/hour <br /> <br /> <br />.........................................,..............................................._....................... <br />JOB TIME AND C ::.T ....:......................... <br />OS <br />......_.._....._.............. <br />....._....._............... <br />Fleet size : 1 Team(s) Total job time : 1,140.88 Hours <br />Unit cost : $0.420 /LCY Total job cost : $627,412 <br /> <br />Struck volume : 21.00 LCY <br />Heaped volume : 31.00 LCY <br />Average volume : 26.00 LCY <br />Adjusted capacity : 31.00 LCY *** <br />hourly production reflects volume per scraper pair on push-pull models <br />Job Condition Corrections : Site altitude (ft.) : 7,500 <br /> Scraper Push dozer Source <br />Altitude adj.: 1.000 NA (Cat HB) <br />Job efficiency : 0.830 NA (Cat HB) <br />Net correction : 0.830 NA
The URL can be used to link to this page
Your browser does not support the video tag.