My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-01-28_REPORT - C1982056
DRMS
>
Day Forward
>
Report
>
Coal
>
C1982056
>
2009-01-28_REPORT - C1982056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:43:10 PM
Creation date
1/29/2009 8:38:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
REPORT
Doc Date
1/28/2009
Doc Name
2008 Annual Reclamation Report
From
Twentymile Coal Company
To
DRMS
Permit Index Doc Type
Annual Reclamation Report
Email Name
JHB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Colorado Division of Minerals and Geology <br />Annual Reclamation Report for the Year 2008 <br />Foidel Creek CO 82-056 Twentymile Coal <br />Mine Name Permit # Permittee <br />Address: 29515 RCR27 Oak Creek. Colorado 80467 <br />This report, required by Rule 2.04.13, is due by February 15 of each year, or other date, as agreed upon by the <br />Division. It should include text, discussion, and maps, at a minimum, in addition to any other reclamation monitoring data as <br />required by the approved permit. The location of the acreage reported under each land status category and year of seeding (if <br />applicable) should be clearly and accurately identified on a map included with the report. <br /> <br />Land Status Category Last Years <br />Cumulative Total <br />This Calendar Year <br />Cumulative Total t <br />Acres disturbed 498.1 22.0 520.1 <br />Acres backfilled and graded 41.2 0.0 41.2 <br />Acres topsoiled 41.2 0.0 41.2 <br />Seeding typically begins the minimum 10-year reclamation liability period. Please report the acres for each category below. <br />Do not include acres that have achieved final, Phase III release. <br /> Last Years <br /> Cumulative This Calendar Cumulative 10 years or less Greater than <br /> Total year. Total t 10 ears t <br />Acres seeded* 41.2 17.0 58.2 58.2 0 <br />*Include, if necessary, a description of any augmented seeding or cultural practices <br />For the Entire Life of Mine, the total number of acres disturbed: 520.1 and the total number of acres: <br />Phase I released 0 Phase II released 0 Phase III released 0 <br />For Mines in Permanent Cessation <br />Total acreage in facilities subject to reclamation but yet to be completed: N/A <br />For Government Performance and Results Act <br />Acreage in long-term mining or reclamation facilities: 461.9 <br />Acreage in active mining areas: N/A <br />1 Exclude acres where Phase III release has been achieved <br />z Includes haul and access roads; temporary dams and impoundments; permanent dams and impoundments; diversion and collector ditches, water and air <br />monitoring sites; topsoil stockpiles; overburden stockpiles; repair, storage and construction areas; office area, repair shops, and parking; coal stockpiles, <br />loading, and processing areas; railroads; coal conveyors; refuse piles and coal mine waste impoundments; head-of-hollow fills; valley fills; ventilation <br />shafts and entryways; and noncoal waste disposal area (garbage dumps and coal combustion by-products disposal areas). <br />3 Includes pits, topsoil stripped areas in advance of pits, and spoil not backfrlled and graded
The URL can be used to link to this page
Your browser does not support the video tag.