Laserfiche WebLink
N 414000 <br />N 412000 <br />N 410000 <br />N 408000 <br />N 406000 <br />N 404000 <br />N 402000 <br />N 400000 <br />r '� i LUUtd <br />Division of Keclamaton, <br />Mining and Safety <br />James "OMB �rc�, r ,��g registered Professional Engineer <br />in the - ' Wi. �Yia' 4'g. certify that this map has been <br />review (fie ' TR -103 is true and correct to the <br />best Q�V.'k`nowl 4b', &_,information. <br />M. Vattern, CO PE No. <br />Date <br />Note: Production may fluctuate according to economic, <br />geologic, or other conditions. Limits are shown for <br />maximum possible production from 2003 through 2008. <br />Operations may actually progress slower than depicted <br />on these maps. Bcckfilling, grading, and topsoil <br />loydown will follow mining operations in a timely <br />manner. <br />SHEET LOCATION INDEX <br />LEGEND <br />400 C 400 800 1200 <br />PERMIT BOUNDARY <br />SCALE: 1 IN = 400 FT <br />CONTOUR INTERVAL: 10 FEET <br />TOPSOIL RECLAIM LIMITS <br />TOPSO STRIP L Topographic information compiled from aerial photography dated 10f07. <br />Project: PR6 Design: m106- ts- rclm_tr103 Plot: m10b_tr103_s3 <br />Revision <br />pate <br />By <br />PR -5 <br />10/22/02 <br />JMM <br />MR -190 <br />9/05/03 <br />KB <br />MR -193 <br />6/04/04 <br />KB <br />MR -201 <br />6/08/05 <br />KB <br />TR -95 <br />8/22/05 <br />KB <br />MR -206 <br />5/22/06 <br />JMM <br />TR -98 <br />1J30/07 <br />vv <br />TR -101 <br />8/10/07 <br />JMM <br />TR -103 <br />5/12/08 <br />JMM <br />SHEET LOCATION INDEX <br />LEGEND <br />400 C 400 800 1200 <br />PERMIT BOUNDARY <br />SCALE: 1 IN = 400 FT <br />CONTOUR INTERVAL: 10 FEET <br />TOPSOIL RECLAIM LIMITS <br />TOPSO STRIP L Topographic information compiled from aerial photography dated 10f07. <br />Project: PR6 Design: m106- ts- rclm_tr103 Plot: m10b_tr103_s3 <br />Revision <br />pate <br />By <br />PR -5 <br />10/22/02 <br />JMM <br />MR -190 <br />9/05/03 <br />KB <br />MR -193 <br />6/04/04 <br />KB <br />MR -201 <br />6/08/05 <br />KB <br />TR -95 <br />8/22/05 <br />KB <br />MR -206 <br />5/22/06 <br />JMM <br />TR -98 <br />1J30/07 <br />JMM <br />TR -101 <br />8/10/07 <br />JMM <br />TR -103 <br />5/12/08 <br />JMM <br />Description <br />PERMIT REVISION <br />CHANGE TOPSOIL STRIP AND RECLAIM <br />LIMITS FOR AE, F, G AND Z PITS <br />CHANGE TOPSOIL STRIP AND RECLAIM <br />LIMITS FOR F AND G PITS <br />ADD TOPSOIL STRIP IN G P IT <br />MIDTERM RESPONSE AND <br />MINE PLAN REVISION <br />CHANGE TOPSOIL STRIP LIMITS <br />FOR G PIT AND Z PITS <br />CHANGE TOPSOIL STRIP LIMITS <br />FOR G PIT AND Z PITS <br />REVISE 2007 STRIPPING LIMITS <br />ADD TOPSOIL STRIP AND RECLAIM <br />F <br />TRAPPER MINE <br />CRAIG, CO. <br />TOPSOIL STRIPPING <br />AND RECLAIM <br />SCALE: 1" = 400' <br />DESIGNED BY: —DJ <br />DRAWN BY LDJ,RDH <br />DATE: 10 -22 -02 <br />�c� 3 <br />Sheet 3 of 3 <br />M10B <br />SHEET 3 1}ennaru�aa <br />7 29/od^ <br />