Laserfiche WebLink
PRO FESSIONAL ENGINEER'S CERTIFICATION <br />James M. Mattern a registered Professional Engineer <br />in the State of Colorado. certify that this map has been <br />reviewe� , and as to TR -103 is true and correct to the <br />best,AM rnCk , 44kRdge on <br />/K-mes M. Mattern. CO HE <br />Date � <br />Note: Production may fluctuate according to economic, <br />geologic. or other conditions. Limits are shown for <br />maximum possible production from 2003 through 2008. <br />Operations may actually progress slower than depicted <br />on these maps. Backfilling, grading, and topsoil <br />loydown will follow mining operations In a timely <br />manner. <br />1 \ \4'\444 \ \\ \, \dt \\ \\4 <br />I 44444h44vv44vvh444g4tty <br />1 � vv4vvhv22v4h4hty v4vvvv4hvvv I <br />I yvvv,grv444vvh4vvvv4vv�v4vv4v <br />onJ jvjIMI,VjvIv1yvh44jv�v�v�vv _ I <br />SHEET LOCATION INDEX <br />400 0 400 800 1200 <br />-- - - - - -- PERMIT BOUNDARY <br />SCALE: 1 IN = 400 FT <br />CONTOUR INTERVAL: 10 FEET <br />TOPSOIL RECLAIM LIMITS <br />TOPSOIL- STRIP LIMITS Topogrophic information comPiled from aerlol photography dated 10/07. <br />Project: PR6 Design: m10b- ts- relm -ti103 Plot: m10b_tr103 -s2 <br />MR -190 <br />9/05/03 <br />KB <br />CHANGE TOPSOIL STRIP AND RECLAIM <br />LIMITS FOR AE, F, G AND Z PITS <br />� c SOIL STRIPPING <br />MR -193 <br />6 04 04 <br />/ / <br />1. <br />CHANGE TOPSOIL STRIP AND RECLAIM <br />, <br />LIMITS FOR F AND G PITS <br />212 ® ®�4NQ RECLAIM <br />C _i8ma(1011, <br />MR -199 <br />3/15/05 <br />KB <br />REVISE F AND Z PIT LIMITS <br />TR -96 <br />8/22/05 <br />KB <br />MIDTERM RESPONSE AND <br />MINE PLAN REVISION <br />,,J�o� ndSate1Y <br />MR -206 <br />5/22/06 <br />JMM <br />6426.5 <br />Sheet 2 of 3 <br />- <br />FOR G PIT AND Z PITS. <br />SCALE: 1'' = 400' <br />DESIGNED BY: LDJ <br />�A O <br />M <br />C <br />2/09/07 <br />JMM <br />REVISE 2006 and 2007 MINE LIMITS <br />I <br />DRAWN BY: LDJ,RDH <br />DATE: 10 -22 -02 <br />SHEET 2 'rrecce�ame <br />TR -103 <br />5/12/08 <br />JMM <br />REVISE 2008 TOPSOIL STRIP AND <br />RECLAIM LIMITS <br />7103 7 z <br />/-A,? <br />6546.1 <br />1 <br />1 <br />7 <br />W <br />W <br />.,, <br />' - ...,., <br />�, r <br />,' ;' <br />, <br />6 55.7.., ....... <br />'i <br />- LI <br />6392,8 <br />I <br />' <br />I <br />6415.4 <br />�....' <br />....,... <br />!' <br />r 't '. <br />1 <br />653 S a I <br />i <br />I <br />'414 00'0 <br />N 06 <br />_ _.... <br />-._ <br />a <br />PRO FESSIONAL ENGINEER'S CERTIFICATION <br />James M. Mattern a registered Professional Engineer <br />in the State of Colorado. certify that this map has been <br />reviewe� , and as to TR -103 is true and correct to the <br />best,AM rnCk , 44kRdge on <br />/K-mes M. Mattern. CO HE <br />Date � <br />Note: Production may fluctuate according to economic, <br />geologic. or other conditions. Limits are shown for <br />maximum possible production from 2003 through 2008. <br />Operations may actually progress slower than depicted <br />on these maps. Backfilling, grading, and topsoil <br />loydown will follow mining operations In a timely <br />manner. <br />1 \ \4'\444 \ \\ \, \dt \\ \\4 <br />I 44444h44vv44vvh444g4tty <br />1 � vv4vvhv22v4h4hty v4vvvv4hvvv I <br />I yvvv,grv444vvh4vvvv4vv�v4vv4v <br />onJ jvjIMI,VjvIv1yvh44jv�v�v�vv _ I <br />SHEET LOCATION INDEX <br />400 0 400 800 1200 <br />-- - - - - -- PERMIT BOUNDARY <br />SCALE: 1 IN = 400 FT <br />CONTOUR INTERVAL: 10 FEET <br />TOPSOIL RECLAIM LIMITS <br />TOPSOIL- STRIP LIMITS Topogrophic information comPiled from aerlol photography dated 10/07. <br />Project: PR6 Design: m10b- ts- relm -ti103 Plot: m10b_tr103 -s2 <br />MR -190 <br />9/05/03 <br />KB <br />CHANGE TOPSOIL STRIP AND RECLAIM <br />LIMITS FOR AE, F, G AND Z PITS <br />� c SOIL STRIPPING <br />MR -193 <br />6 04 04 <br />/ / <br />KB <br />CHANGE TOPSOIL STRIP AND RECLAIM <br />LIMITS FOR F AND G PITS <br />212 ® ®�4NQ RECLAIM <br />C _i8ma(1011, <br />MR -199 <br />3/15/05 <br />KB <br />REVISE F AND Z PIT LIMITS <br />TR -96 <br />8/22/05 <br />KB <br />MIDTERM RESPONSE AND <br />MINE PLAN REVISION <br />,,J�o� ndSate1Y <br />MR -206 <br />5/22/06 <br />JMM <br />CHANGE TOPSOIL STRIP LIMITS <br />Sheet 2 of 3 <br />FOR G PIT AND Z PITS. <br />SCALE: 1'' = 400' <br />DESIGNED BY: LDJ <br />�A O <br />M <br />TR -98 <br />2/09/07 <br />JMM <br />REVISE 2006 and 2007 MINE LIMITS <br />AND ADD G TEST PIT 120• BUFFER <br />DRAWN BY: LDJ,RDH <br />DATE: 10 -22 -02 <br />SHEET 2 'rrecce�ame <br />TR -103 <br />5/12/08 <br />JMM <br />REVISE 2008 TOPSOIL STRIP AND <br />RECLAIM LIMITS <br />7103 7 z <br />/-A,? <br />