Laserfiche WebLink
PART R <br />Page No. 21 <br />Permit No. CO-0044377 <br />• PART II <br />A. NOTIFICATION REQUIREMENTS <br />1. Notification to Parties <br />All notification requirements under this section shall be directed az follows: <br />a. Oral Notifications, other than (or spills, during normal business hours shall be to: <br />Permits and Enforcement Section <br />Water Quality Control Division <br />Telephone No.: (303)+692-3590 <br />Spills notifications at any time and other notifications after hours shall be to <br />Emergency Response Unit <br />Office of the Environment <br />Telephone No.: (303)+756-4455 <br />b. Written notification shall be to: <br />Industrial Permits and Enforcement Program <br />Colorado Department of Public Health and Environment <br />WQCD-PE-B2 <br />4300 Cherry Creek Drive South <br />• Denver, CO 80222 <br />2. Change in Discharne <br />The permittee shall notify the Division, in writing, oC any planned physical alterations or additions to the permitted <br />facility. Notice is required only when: <br />a. The alteration or addition could significantly change the nature or increase the quantity or pollutants discharged; or <br />b. The alteration or addition results in a significant change in the permittee's sludge use or disposal practices, and such <br />alteration, addition, or change may justify the application of permit conditions that are different Gom or absent in <br />the existing permit, including notification of additional use or disposal sites not reported pursuant to an approved <br />land application plan. <br />The permittee shall give advance notice to the Division of any planned changes in the permitted facility or activity which <br />may result in noncompliance with permit requirements. <br />Whenever notification of any planned physical alterations or additions to the permitted facility is required pursuant to this <br />section„ the permittee shall furnish the Division such plans and specifications which the Division deems reazonably <br />necessary to evaluate the effect on the discharge, the stream, or ground water. if the Division finds that such new or <br />altered discharge might be inconsistent with the conditions of the permit, the Division shall require a new or revised <br />permit application and shall follow the procedures specified in Sections 6.6.0 through 6.7.0, and 6.16.0 of the <br />Regulations for the State Discharge Permit System. <br />• <br />1NDBP NmnnOer f0, IVRI <br />